Three new AEP buildings planned at 2400 FM 3251
Three new pre-engineered metal buildings are listed for the AEP Hallsville project at 2400 FM 3251: an electrical building for equipment and battery storage, a water treatment building, and an administration building for control room operations. TDLR project registrations were filed from July 2 through July 21, 2026; all three show a status of Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 21, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 21, 2026
- since Jul 2, 2026
- Largest scope
- 7,280 sf
- Estimated cost
- $3.4M
- state registration
Where this project stands
Under constructionAEP Hallsville, TX Building Designs
4,905 sq ft · $2.4M est.
- RegisteredJul 21, 2026
- Plan review
- ConstructionJul '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsThe project generally consists of a 4,905 sq ft pre-engineered metal building to accommodate electrical equipment and battery storage. the building foundation and sitework are outside the scope of work and are shown for reference only. — electrical building
TDLR project registrationNew ConstructionReview Complete4,905 sq ft$2.4M est.- Project #
- TABS2026025794
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
The project generally consists of a 5,100 sq ft pre-engineered metal building to accommodate water treatment equipment. the building foundation and sitework are outside the scope of work and are shown for reference only. — water treatment building
TDLR project registrationNew ConstructionReview Complete5,100 sq ft$2.1M est.- Project #
- TABS2026025136
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Project generally consists of a 7,280 sq ft pre-engineered metal building to accommodate administration & control room operations. control room, dcs, & it closet will have raised access flooring. building foundation & sitework are outside scope of work. — administration building
TDLR project registrationNew ConstructionReview Complete7,280 sq ft$3.4M est.- Project #
- TABS2026024365
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2400 FM 3251
What is being built at 2400 FM 3251 in Hallsville?
TDLR registrations describe three new pre-engineered metal buildings for electrical equipment and battery storage, water treatment equipment, and administration and control room operations. The filings were submitted from July 2 through July 21, 2026.
What is the AEP Hallsville project?
The AEP Hallsville project registrations cover three new buildings, including electrical, water treatment, and administration buildings. Each registration lists its status as Review Complete.
Is there a new electrical building planned in Hallsville?
Yes. Registration TABS2026025794, filed July 21, 2026, describes a 4,905-square-foot pre-engineered metal building for electrical equipment and battery storage.
Is a water treatment building planned at 2400 FM 3251?
A TDLR registration filed July 13, 2026, describes a 5,100-square-foot pre-engineered metal building to accommodate water treatment equipment. The registration number is TABS2026025136.
What will the administration building at 2400 FM 3251 be used for?
The 7,280-square-foot building is described as accommodating administration and control room operations, including control room, DCS, and IT closet space. It is listed in registration TABS2026024365, filed July 2, 2026.
When will construction start at 2400 FM 3251?
The available TDLR records show project registrations filed between July 2 and July 21, 2026, and marked Review Complete. They do not state a construction start date.