6310 Midway Road
Haltom City, TX 76117 · A O Smith Water Treatment North America INC
AO Smith process area addition in Haltom City
A process area is planned within a 3,369-square-foot industrial building at 6310 Midway Road, according to a TDLR project registration for an alteration. The registration, named “AO Smith - Haltom City, TX,” was filed September 22, 2026, and lists an estimated project cost of $850,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2026
- since Sep 22, 2026
- Largest scope
- 3,369 sf
- Estimated cost
- $850K
- state registration
Where this project stands
Under constructionAO Smith - Haltom City, TX
3,369 sq ft · $850K est.
- RegisteredSep 22, 2026
- Plan review
- ConstructionOct '26 – Apr '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectScope of work is for add of process area within a 3,369 sq ft industrial building. — ao smith
TDLR project registrationRenovation/AlterationReview Complete3,369 sq ft$850K est.- Project #
- TABS2027001637
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6310 Midway Road
What is being built at 6310 Midway Road in Haltom City?
A TDLR registration describes an addition of a process area within an existing 3,369-square-foot industrial building. The project is listed as a renovation or alteration.
When was the project at 6310 Midway Road registered?
The TDLR project registration, number TABS2027001637, was filed September 22, 2026. Its status is listed as Review Complete.
How much is the 6310 Midway Road project expected to cost?
The TDLR registration lists an estimated project cost of $850,000. This is the applicant’s estimate for the project.
Is a new industrial building being built at 6310 Midway Road?
The registration describes adding a process area within a 3,369-square-foot industrial building, not constructing a new building.
What is being built near Weaver Warehouse in Haltom City?
The AO Smith project at 6310 Midway Road is about 394 meters from Weaver Warehouse, according to the location records. It involves adding a process area within an industrial building.
What is happening near Pecan Court Mcdonald Enterprises?
A process area addition is registered at 6310 Midway Road, about 323 meters from Pecan Court Mcdonald Enterprises. The TDLR filing is dated September 22, 2026.
Also being built nearby
All of 76117- 2300 Solona Street · Devin Investments, LLCAug 29, 2024School of music — renovation/alteration — construct offices inside exiting structure · 233 m away
- 6120 Midway Rd · Elliott Electric SupplyJun 25, 2025Eliott electric supply - haltom city — new construction — new supply warehouse with office section · 252 m away
- 2351 Pecan Court · Mcdonald Enterprises Inc.Nov 19, 2025Pecan court mcdonald enterprises — renovation/alteration — repair drywall, paint, install new ceiling tiles and flooring. repair demising wall. make electrical in good working order. modify and install new hvac ducts to meet code · 323 m away
- 2347 Pecan Court · Mcdonald Enterprises Inc.Nov 11, 2025Pecan court mcdonald enterprises — renovation/alteration — repair drywall, paint, install new ceiling tiles and flooring. repair demising wall. make electrical in good working order. modify and install new hvac ducts to meet code · 337 m away
- 2417 Weaver St · Cantex Weaver, LLCAug 20, 2026Weaver warehouse — new construction — 8949sf new pemb building on 1.8 ac · 394 m away
- 6301 Airport Freeway · Arrow Group Investment LLCSep 30, 2024Arrow personnel — renovation/alteration — remodel & renovation of interior spaces including new mep · 444 m away