305 Millers Crossing
Harker Heights, TX 76548 · City Of Harker Heights
Warriors Path road reconstruction in Harker Heights
A City of Harker Heights project calls for reconstructing and widening the existing asphalt roadway on Warriors Path, with new curbs, gutters, curb ramps and sidewalks. The TDLR project registration was filed March 22, 2024, and lists the status as Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 22, 2024
- since Mar 22, 2024
- Largest scope
- 100,000 sf
- Estimated cost
- $4.1M
- state registration
Where this project stands
Inspected · closing outCity of Harker Heights-Warriors Path Reconstruction, Ph II
100,000 sq ft · $4.1M est.
- RegisteredMar 22, 2024
- Plan review
- ConstructionAug '24 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReconstruction of an existing asphalt road to include widen roadways with new curb, gutter curb ramps and sidewalks — warriors path
TDLR project registrationNew ConstructionInspection Complete100,000 sq ft$4.1M est.- Project #
- TABS2024014507
- Tenant / owner
- City Of Harker Heights-Warriors Path Reconstruction, Ph II
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 305 Millers Crossing
What is being built at 305 Millers Crossing in Harker Heights?
A City of Harker Heights project calls for reconstructing and widening Warriors Path, an existing asphalt road, and adding curbs, gutters, curb ramps and sidewalks. The TDLR registration was filed March 22, 2024, as TABS2024014507.
What road project is near Fikes Wholesale in Harker Heights?
The Warriors Path reconstruction project is listed near Fikes Wholesale, at 500 E FM 2410. The work includes widening the existing roadway and adding curbs, gutters, curb ramps and sidewalks.
When was the Warriors Path reconstruction permitted?
The TDLR project registration was filed March 22, 2024. The record number is TABS2024014507.
How much is the Warriors Path road project expected to cost?
The TDLR record lists an estimated project cost of $4,125,000. This is the applicant's estimate for the project.
What work is planned for Warriors Path in Harker Heights?
The project description says the existing asphalt road will be reconstructed and widened, with new curbs, gutters, curb ramps and sidewalks.
Is the Warriors Path reconstruction complete?
The TDLR record lists the project's status as Inspection Complete. It does not provide a completion date.
Also being built nearby
All of 76548- 500 E FM 2410 · Fikes Wholesale LLCFeb 11, 2026Casey's #4742 - harker heights — renovation/alteration — interior remodel with new walk-in coolers, kitchen rework, ada upgrades, roof doas, and related mep · 245 m away
- 408 FM 2410 · Take 5 Properties Spv, LLCJul 2, 2026Take 5 oil change - harker heights — renovation/alteration — remodal of oil change facility · 307 m away
- 110 E Central Texas Expressway · 110 E Central TX Highway LLC & Highway 190 LLCApr 6, 2026Mavis tire & brakes harker heights — renovation/alteration — interior and exterior alterations. 7,990 sq ft · 475 m away
- 100 E Central Texas Expy · StarbucksMay 4, 2024Starbucks knights way & hwy 190 — renovation/alteration — renovation of an existing starbucks store · 511 m away
- 300 West Central Texas Expy · Abbott Springs LtdMay 6, 2025Rockin ramen — renovation/alteration — tenant finish remodel for a 2,045 s.f. restaurant remodel · 558 m away
- 201 E Central Expy · Drp Market Heights Property Owner LLCFeb 12, 202685c bakery cafe harker heights finish out — renovation/alteration — tenant finish out of demised suite in existing shell building · 584 m away
- 201 E Central Texas Expwy · Target CorporationDec 20, 2024Target drive-up expansion t-2374 harker heights — renovation/alteration — parking lot re-striping, parking stall and wayfinding drive up beacons, install (2) supplemental site lighting fixtures, and their foundations for the expanded drive-up area 8,700 sq ft · 584 m away
- 201 E Central Texas Expressway Space No. 270 · Drp Market Heights Property Owner, LLCFeb 24, 2025Buckle 288 — renovation/alteration — tenant finish out · 584 m away
- 201 E Central Texas Expy · Target CorporationOct 14, 2026Target 2374 remodel — renovation/alteration — sales floor: include store fixture, wall finish, floor finish, and lighting updates · 584 m away
- 201 East Central Texas Expressway · Drp Market Heights Property Owner, LLCMar 5, 2026Potbelly sandwich shop — renovation/alteration — 1619 sq ft - tenant improvement of previous restaurant for new restaurant concept. minor demolition. distribution of mpe for new proposed layout · 584 m away