2717 Airport Dr

Harlingen, TX 78550 · Texas State Technical College

TSTC plans renovation of Harlingen Building 20PM

A renovation is planned for approximately 26,500 square feet of Texas State Technical College’s existing Building 20PM at 2717 Airport Dr. The project was registered with TDLR on March 13, 2024, and most of the work is described as buildout in a previously unoccupied area. The applicant’s estimated project cost is $9.2 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 13, 2024

Projects
1
1 filings
Latest filing
Mar 13, 2024
since Mar 13, 2024
Largest scope
26,500 sf
Estimated cost
$9.2M
state registration

Where this project stands

Completed

TSTC Harlingen 20PM Renovation

26,500 sq ft · $9.2M est.

  1. RegisteredMar 13, 2024
  2. Plan review
  3. ConstructionMay '24 – Mar '25
  4. Inspected
  5. Closed

Ran as a 11-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Renovate approximately 26,500 sq ft of the existing 20pm building. majority of buildout is within previously unoccupied area. — building 20pm

    TDLR project registrationRenovation/AlterationProject Closed26,500 sq ft$9.2M est.
    Tenant / owner
    Tstc Harlingen 20pm Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2717 Airport Dr

What is being renovated at 2717 Airport Dr in Harlingen?

A TDLR registration describes renovation of approximately 26,500 square feet of Texas State Technical College’s existing Building 20PM. Most of the buildout is in a previously unoccupied area.

When was the Building 20PM renovation registered?

The TDLR project registration was filed on March 13, 2024. Its project number is TABS2024013762.

How much will the TSTC Harlingen renovation cost?

The applicant’s estimated cost for the project is $9.2 million, according to the TDLR registration.

How much space is included in the TSTC Building 20PM project?

The project description says approximately 26,500 square feet of the existing building will be renovated.

Is a new building planned at 2717 Airport Dr?

The TDLR registration describes renovation and alteration of the existing Building 20PM, not construction of a new building.

Is the Building 20PM renovation complete?

The TDLR record lists the project status as closed. The record does not specify when construction was completed.