PNC Bank plans ADA work and a drive-up ATM in Harlingen
A PNC Bank project at 521 N 77 Sunshine Strip calls for sidewalk and pavement replacement, new accessible parking, and a drive-up ATM. The April 3, 2025, TDLR registration also describes converting part of the break room into a service room for the ATM. The applicant estimated the project cost at $325,000; the registration lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 3, 2025
- since Apr 3, 2025
- Largest scope
- 18,163 sf
- Estimated cost
- $325K
- state registration
Where this project stands
CompletedPNC Bank ADA Remediation Design - Harlingen
18,163 sq ft · $325K est.
- RegisteredApr 3, 2025
- Plan review
- ConstructionJul '25 – Aug '25
- Inspected
- Closed
Ran as a 1-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectExterior replaces sidewalk, pavement & new ada parking, eliminates parking for a new drive-up atm; milling / paving the remaining site. 18,163 sq ft interior converts a portion of break room to a service room for the new atm 31 sq ft — e545 harlingen
TDLR project registrationRenovation/AlterationProject Closed18,163 sq ft$325K est.- Project #
- TABS2025015767
- Tenant / owner
- Pnc Bank Ada Remediation Design - Harlingen
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 521 N 77 Sunshine Strip
What is being built at 521 N 77 Sunshine Strip?
A PNC Bank project registration describes sidewalk and pavement replacement, new accessible parking, and a drive-up ATM. It also calls for converting part of the break room into a service room for the ATM.
Is PNC Bank adding a drive-up ATM in Harlingen?
The TDLR registration describes a new drive-up ATM at 521 N 77 Sunshine Strip. It was filed April 3, 2025, under project number TABS2025015767.
When was the PNC Bank project permitted?
The project was registered with the Texas Department of Licensing and Regulation on April 3, 2025. The registration lists its status as closed.
How much will the PNC Bank project cost?
The applicant estimated the project cost at $325,000 in the TDLR registration. This is an estimate, not a reported final cost.
What accessibility work is planned at PNC Bank on 77 Sunshine Strip?
The project description calls for replacing sidewalk and pavement and adding accessible parking. It also describes milling and paving the remaining site.
What is being built near Casa Kevin Harlingen on North 77 Sunshine Strip?
The PNC Bank project at 521 N 77 Sunshine Strip includes site work and a new drive-up ATM. Casa Kevin Harlingen is listed nearby, 269 meters away.
Also being built nearby
All of 78550- 727 North 77 Sunshine Strip · Casa Kevin Harlingen LLCApr 23, 2025Casa kevin harlingen remodel — renovation/alteration — remodel · 269 m away
- 421 S. 13th St · First Christian Church HgnNov 3, 20252025-011 faith christian church renovation — renovation/alteration — aprox 2000 sq ft church restrooms and welcome room renovations, with the addition of a new entrance and ramp from the east side that directs occupants to thre parking lot · 281 m away
- 901 N 77 Sunshine Strip · Sv Plaza Del Sol LLCOct 22, 2026N 77 sunshine strip & n 13th st — renovation/alteration — new interior partitions, equipment, fixtures, finishes, drive thru equipment & exterior patio furniture. 1422 sq ft · 333 m away
- 1106 E. Tyler Ave · Leviathan Endeavors LLCFeb 18, 2026Mac plaza — new construction — construction of a new plaza and associated parking area. 24,500 sq ft · 489 m away
- 2005 E. Tyler Ave · Elizondo Investment Properties LLCFeb 11, 2026Suite 2 interior finish-out — new construction — interior finish-out in an existing building. 2569 sq ft · 512 m away
- 2026 E. Tyler Ave · Tdn Holdings, LLCSep 19, 2024The flory building unit b finish-out remodel — renovation/alteration — remodel interior finish out on existing building · 531 m away