1100 Texas St
Houston, TX 77002 · Magnolia Hotel
Magnolia Hotel permit covers converting a window to a door
A City of Houston permit indicates work at the Magnolia Hotel at 1100 Texas St to convert an existing window to a door. The permit was filed May 28, 2026. A separate 2017 permit record describes a high-rise hotel remodel.
Summarized from City of Houston records · updated May 28, 2026
- Projects
- 2
- 3 filings
- Latest filing
- May 28, 2026
- since Jun 28, 2017
- Largest scope
- —
- Listed value
- $3K
- partial · often understated
Where this project stands
Construction underwayConvert existing window to door
$3K
- Building permitMay 28, 2026
- Trade permitsMay 21, 2026
- Occupancy
Plumbing, electrical or fire permits are filed, so trades are on site or about to be.
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
2 projectsSources: City of Houston
Questions about 1100 Texas St
What is being built at 1100 Texas St in Houston?
A May 28, 2026, City of Houston permit for the Magnolia Hotel describes converting an existing window to a door. The record does not describe a new building.
Is a new hotel being built at 1100 Texas St?
The available permit records describe work at the existing Magnolia Hotel, not construction of a new hotel. The latest permit is for converting an existing window to a door.
When was the Magnolia Hotel permit filed?
The latest listed permit was filed May 28, 2026. It is City of Houston permit 26043484.
What does permit 26043484 cover?
City of Houston permit 26043484 describes converting an existing window to a door at the Magnolia Hotel. It was filed May 28, 2026.
What was the earlier permit for the Magnolia Hotel?
A City of Houston permit filed June 28, 2017, describes a high-rise hotel remodel. The permit number is 17041759.
What is happening near Hyatt Place on Texas Street?
At the Magnolia Hotel, next to Hyatt Place at 1114 Texas St, a May 28, 2026, permit describes converting an existing window to a door.
Also being built nearby
All of 77002- 625 Fannin StApr 24, 2017(epr) retail buildout · 24 m away
- 1114 Texas St FprmJun 16, 2020Fire pump room in high rise hotel 100% · 25 m away
- 1114 Texas St · Hyatt PlaceOct 17, 2025Hotel generator replacement · 25 m away
- 611 Fannin StDec 22, 2021Parking garage repair per spec list -1 · 34 m away
- 1120 Texas StApr 7, 2023Commercial condos sidewalk repair · 47 m away
- 1121 Capitol StSep 22, 2021Office chiller and pump replacement · 56 m away
- 609 Main St · Kirkland And EllisOct 16, 202616,990 sq ft hi-rise office remodel (m/2) · 88 m away
- 1117 Texas StApr 29, 202033m repair to framing, church 100% · 90 m away
- 1001 Texas StMay 14, 2020(epr) hi-rise office remodel 100% · 128 m away
- 609 Main Street, Floors 25 & 26 · 609 MainNov 21, 2024Project ph — renovation/alteration — renovation work of the entire level 25 and partial level 26. this scope includes a new interconnecting stair and will comprise of a mixture of offices, conference rooms and break rooms · 128 m away
- 609 Main Street, Floors 26 · 609 MainJan 10, 2025609 base building — renovation/alteration — renovation of multi-tenant corridor and existing core restrooms · 128 m away
- 609 Main Street · Hcg Block 69 LP (hines)Apr 10, 2026Crescent energy — renovation/alteration — interior alteration of suite 1200. proposed interior renovation consists of new partitions, ceilings, and finishes · 128 m away
More hotels in 77002.