2121 Main St
Houston, TX 77002 · Greyhound Bus Lines, Inc.
Interior wall demolition permitted at 2121 Main St
City of Houston permits indicate interior non-load-bearing, non-fire-rated wall demolition at 2121 Main St. The latest permit was filed April 4, 2025 (No. 25031707); an earlier permit for the same work was filed January 13, 2025 (No. 25002916).
Summarized from City of Houston records · updated Apr 4, 2025
- Projects
- 3
- 5 filings
- Latest filing
- Apr 4, 2025
- since Aug 18, 2020
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2025 · no recent filingsDemolition of interior non-load bearing non-fire rated walls
- Building permitApr 4, 2025
- Trade permitsApr 3, 2025
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
3 projectsSources: City of Houston
Questions about 2121 Main St
What is being built at 2121 Main St in Houston?
The records provided do not identify a new building. Houston permits indicate interior wall demolition, most recently filed April 4, 2025, under permit No. 25031707.
What work was permitted at 2121 Main St?
The April 4, 2025 permit (No. 25031707) describes demolition of interior non-load-bearing, non-fire-rated walls. A permit for the same work was filed January 13, 2025 (No. 25002916).
Is a restaurant opening at 2121 Main St?
The records do not identify a new restaurant opening. They show a restaurant remodel permit filed August 18, 2020 (No. 20029358), and more recent permits for interior wall demolition.
What’s happening near Midtown Central Square on Main Street?
At 2121 Main St, near Midtown Central Square at 2100 Travis St, Houston permits indicate interior wall demolition. The latest permit, No. 25031707, was filed April 4, 2025.
What is happening near Yama Kitchen in Houston?
Permits for 2121 Main St, near Yama Kitchen at 2020 Travis St, describe interior wall demolition. The latest filing was April 4, 2025, under permit No. 25031707.
Also being built nearby
All of 77002- 2017 Main StFeb 6, 2023Demolition bld/sewer disc · 78 m away
- 2205 Fannin StMar 18, 2019Fitness club repair per spec list · 85 m away
- 2001 Fannin StDec 10, 20212,600 sq ft conversion to grocery store · 114 m away
- 2016 Main St · Williams GildaJul 15, 2026200 sq ft bathroom remodel condo · 131 m away
- 2100 Travis Street · Innerbelt Northwest Building 04Sep 5, 2025Project nine — renovation/alteration — interior build out of a data center support facility for a confidential client. two-story tenant build-out in existing concrete tiltwall shell building (type iib - esfr sprinklered). storage of electronic components packed in cardboard boxes on she · 165 m away
- 2100 Travis Street · Midtown Central Square, LLCMay 29, 2025Midtown central square, llc — renovation/alteration — remodel of existing office space · 165 m away
- 2302 Fannin Street · 2300 Fannin Ltd.Aug 9, 2025Holiday inn express & suites — new construction — construction of new hotel with 101 rooms · 165 m away
- 2211 San Jacinto StAug 16, 20183650 sq ft office remodel · 172 m away
- 2302 Fannin St · 2300 Fannin Ltd.Apr 13, 202698,882 hotel/add(m/2) hirise convt · 176 m away
- 2302 Fannin St RoofFeb 9, 2022Rooftop cell tower equipment upgrades · 176 m away
- 2302 Fannin St FpApr 13, 2026505 sq ft fire pump room/installation (2/2) · 176 m away
- 2301 Main St · Ox Main, LLCAug 25, 2025(15% fire damage) repairs for exist. restaurant · 180 m away