4385 Cougar Village Drive, Cv1
Houston, TX 77002 · University Of Houston
Cougar Village I to get mailbox, lounge and common-area redesign
A 63,000-square-foot renovation at Cougar Village I will convert the mailbox area into office spaces, turn two lounges on floors 2–7 into study spaces, and refinish common areas. The University of Houston project was registered with TDLR on September 19, 2024; the applicant estimated its cost at $3.5 million, and its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 19, 2024
- since Sep 19, 2024
- Largest scope
- 63,000 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Inspected · closing outCougar Village I Mailbox and Common Area Redesign
63,000 sq ft · $3.5M est.
- RegisteredSep 19, 2024
- Plan review
- ConstructionNov '24 – Jun '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRedesign of mailbox area to become office spaces; redesign of two lounge spaces on floor 2-7 to become study spaces; refinishing of common areas — university of houston
TDLR project registrationRenovation/AlterationInspection Complete63,000 sq ft$3.5M est.- Project #
- TABS2025001393
- Tenant / owner
- Cougar Village I Mailbox And Common Area Redesign
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4385 Cougar Village Drive, Cv1
What is being built at 4385 Cougar Village Drive?
The project is a redesign of Cougar Village I’s mailbox area, two lounges on floors 2–7, and common areas. The mailbox area is planned to become office spaces, and the lounges are planned to become study spaces.
Is Cougar Village I getting new study spaces?
Yes. The TDLR project description says two lounges on floors 2–7 will be redesigned as study spaces.
What is happening to the mailbox area at Cougar Village I?
The mailbox area is being redesigned to become office spaces, according to the project registration.
When was the Cougar Village I renovation filed?
The TDLR registration for Cougar Village I Mailbox and Common Area Redesign is dated September 19, 2024.
How much will the Cougar Village I redesign cost?
The applicant’s estimated cost for the project is $3.5 million, according to its TDLR registration. This is an estimate, not a reported final cost.
Is the Cougar Village I project complete?
The TDLR record lists the project status as “Inspection Complete.”