2405 Navigation Blvd
Houston, TX 77003 · Our Lady Of Guadalupe Catholic Church
Our Lady of Guadalupe plans restroom renovations
Restroom renovations at Our Lady of Guadalupe Catholic Church were registered with TDLR on September 9, 2025. The project converts a first-floor classroom into multi-stall and single-user restrooms and renovates a second-floor restroom to meet ADA requirements. The applicant estimated the project cost at $550,000; its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2025
- since Sep 9, 2025
- Largest scope
- 1,246 sf
- Estimated cost
- $550K
- state registration
Where this project stands
Inspected · closing outOur Lady of Guadalupe Restroom Renovation
1,246 sq ft · $550K est.
- RegisteredSep 9, 2025
- Plan review
- ConstructionDec '25 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of classroom on level 1 into multi-stall restroom and single user restroom. also renovation of restroom on level 2 to meet ada requirements — our lady of guadalupe
TDLR project registrationRenovation/AlterationInspection Complete1,246 sq ft$550K est.- Project #
- TABS2026000506
- Tenant / owner
- Our Lady Of Guadalupe Restroom Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2405 Navigation Blvd
What is being built at 2405 Navigation Blvd?
The project is a restroom renovation at Our Lady of Guadalupe Catholic Church. It includes converting a first-floor classroom into multi-stall and single-user restrooms and renovating a second-floor restroom to meet ADA requirements.
When was the restroom renovation registered?
The TDLR project registration is dated September 9, 2025. Its project number is TABS2026000506.
Is the Our Lady of Guadalupe restroom project complete?
TDLR lists the project status as inspection complete. The registration describes renovation work on restrooms on both levels of the building.
How much will the Our Lady of Guadalupe restroom renovation cost?
The applicant's estimated cost for the project is $550,000. This is an estimate for the project, not a final reported cost.
What is being renovated near 2311 Canal?
At 2405 Navigation Blvd, Our Lady of Guadalupe Catholic Church registered a restroom renovation project. The site is about 124 meters from 2311 Canal.
What construction is happening next to Triten Eado-The Mill?
A restroom renovation is registered at Our Lady of Guadalupe Catholic Church, 2405 Navigation Blvd, about 184 meters from Triten Eado-The Mill. The project includes first- and second-floor restroom work.
Also being built nearby
All of 77003- 2404 Navigation BlvdJan 22, 20242,941 sq ft restaurant buildout · 60 m away
- 2404 Navigation Blvd FpMar 5, 2020(epr) fire pump room 100% / (10/17) · 60 m away
- 2422 Navigation Blvd BldgfOct 13, 2017Condo repair · 113 m away
- 2311 Canal St · 2311 Canal LLCMay 8, 2026Demolition of interior non-load bearing non-fire rated walls · 124 m away
- 2310 Navigation BlvdMar 29, 2024Demolition building/sewer disc · 128 m away
- 205 N Saint Charles St NextApr 4, 2024Residential addition · 170 m away
- 2311 Navigation BlvdMay 2, 20235,215 sq ft new shell and core building (futr a2) · 171 m away
- 2309 Navigation BlvdApr 25, 20245,797 sq ft new building and core for futr a2 · 171 m away
- 2218 Ann StJul 20, 2017Remove & replace (7) windows per spec list · 173 m away
- 2315 Navigation Blvd · Triten Eado-The MillMar 31, 2025Apartmt new outdoor swimmg pool on the 3rd floor · 184 m away
- 2315 Navigation Blvd GaragAug 19, 2022New 196656 sq ft open parking garage sp/ (4/6) · 184 m away
- 2315 Navigation Blvd FpAug 19, 2022New 480 sq ft fire pump room sp/ (6/6) · 184 m away