4211 Elgin St
Houston, TX 77004 · UH Gsb Ramp Remodel, UH Gsb Lobby Renovation
UH General Services Building lobby and ramp renovations
TDLR records list two renovations at the multi-tenant building at 4211 Elgin St, including work on the UH General Services Building lobby and entrance ramp. The lobby project was registered May 23, 2024, and the ramp remodel was registered March 31, 2025; the records describe interior upgrades and a new accessible ramp and walkway.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 31, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 31, 2025
- since May 23, 2024
- Largest scope
- 1,500 sf
- Estimated cost
- $225K
- state registration
Where this project stands
Under constructionUH GSB Ramp Remodel
1,322 sq ft · $154K est.
- RegisteredMar 31, 2025
- Plan review
- ConstructionMay '25 – Sep '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projects1322 sq ft renovation including demolition of existing entrance/egress ramp to the uh gsb and constructing a new tas compliant ramp and sloped walkway. also includes replacing part of existing pathway with new concrete pathway. — uh general services building
TDLR project registrationRenovation/AlterationReview Complete1,322 sq ft$154K est.- Project #
- TABS2025015454
- Tenant / owner
- UH Gsb Ramp Remodel
- Design firm
- Pro
- Contact
- Pro
Project scope is for interior renovation of existing lobby area of the uh general services building. scope includes modifying offices and reception area with new interior walls, doors, glazing, flooring and ceilings. — general services building
TDLR project registrationRenovation/AlterationReview Complete1,500 sq ft$225K est.- Project #
- TABS2024019205
- Tenant / owner
- UH Gsb Lobby Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4211 Elgin St
What is being built at 4211 Elgin St in Houston?
TDLR records list renovations to the UH General Services Building lobby and entrance ramp at the multi-tenant building. They describe alterations to existing spaces, not a new building.
What is the UH General Services Building ramp remodel?
The 1,322-square-foot project includes removing the existing entrance and egress ramp and constructing a new TAS-compliant ramp and sloped walkway, plus replacing part of an existing path with concrete. It was registered March 31, 2025, under TABS2025015454.
What changes are planned for the UH General Services Building lobby?
The 1,500-square-foot renovation modifies offices and the reception area, with new interior walls, doors, glazing, flooring, and ceilings. The project was registered May 23, 2024, under TABS2024019205.
When were the renovations at 4211 Elgin St permitted?
TDLR registrations show the lobby renovation dated May 23, 2024, and the ramp remodel dated March 31, 2025. These are project registration dates.
Is a new building planned at 4211 Elgin St?
The records provided describe two renovations to existing areas of the UH General Services Building: its lobby and entrance ramp.
How much will the 4211 Elgin St projects cost?
The fact sheet lists a TDLR estimated cost of $225,000 and a reported permit valuation of $379,380. The reported valuation is partial and should not be treated as the total project cost.