5400 Fannin St
Houston, TX 77004
5400 Fannin St: 1 project on record
City of Houston lists 1 filing across 1 project at 5400 Fannin St, Houston, TX 77004. The most recent, filed January 24, 2019, covers: “Mechanical upgrades (3 of 3)”.
Compiled from City of Houston records · updated Jan 24, 2019
- Projects
- 1
- 1 filings
- Latest filing
- Jan 24, 2019
- since Jan 24, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2019 · no recent filingsMechanical upgrades (3 of 3)
- Building permitJan 24, 2019
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 5400 Fannin St
What is being built at 5400 Fannin St?
The latest filing (City of Houston permit 18132467, January 24, 2019) covers mechanical upgrades (3 of 3).
How many permits and filings does 5400 Fannin St have?
1 filing across 1 project, from January 24, 2019 to January 24, 2019.
What is being built near St. Paul's United Methodist Church in Houston?
5400 Fannin St is about 120 m from St. Paul's United Methodist Church (5501 Main Street). Its latest filing is for mechanical upgrades (3 of 3).
Is there other construction near 5400 Fannin St?
Yes. Nearby filings include 5400 Fannin St Bsmt (7,367 sq ft church remodel sp, Jul 31, 2024); 5501 Main St (church remodel with minor sitework, Jan 31, 2019); 5501 Main Street (jones building basement renovation — renovation/alteration — the project consists of a renovation to the basement of a 2 story (above-grade) building. the renovation is an interior only renovation limited to the basement level of the building. the renovation includes 5 classrooms for church-use only (a-3), Apr 23, 2024).
How do I get alerts for new permits at 5400 Fannin St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77004- 5400 Fannin St BsmtJul 31, 20247,367 sq ft church remodel sp · 52 m away
- 5501 Main StJan 31, 2019Church remodel with minor sitework · 120 m away
- 5501 Main Street · St. Paul's United Methodist ChurchApr 23, 2024Jones building basement renovation — renovation/alteration — the project consists of a renovation to the basement of a 2 story (above-grade) building. the renovation is an interior only renovation limited to the basement level of the building. the renovation includes 5 classrooms for church-use only (a-3) · 120 m away
- 5501 Main St Base.Jan 24, 2019Church remodel in basement sp (2 of 3) · 120 m away
- 5200 Fannin StAug 6, 2023Church (172) solar panels install · 141 m away
- 5300 Caroline StMar 10, 2020Commercial demolition of exterior non load bearing walls · 163 m away
- 1112 Southmore BlvdMar 14, 2017Occ report/bar/2500 sq ft/2003 code · 172 m away
- 5500 Main StAug 10, 2020(epr) 5,423sf restnt/cafe buildout 100% · 192 m away
- 1220 Calumet StAug 14, 2020Demolition res/sewer disc · 207 m away
- 5619 Fannin Street · Museum Of Fine Arts, Houston Center For ConservationNov 20, 2025Museum of fine arts, houston center for conservation completion — renovation/alteration — selective demolition and renovation of selected interior construction on levels g3, 4 and roof of museum of fine arts, houston center for conservation in the beck garage · 213 m away
- 5401 Caroline StApr 24, 2019Epr - interior non-load bearing exhibit walls with elec · 214 m away
- 1201 Southmore BlvdApr 25, 2018Demolition bld/ sewer disc · 216 m away