4899 Montrose Blvd
Houston, TX 77006
High-rise apartment pool rebuild at 4899 Montrose Blvd
A high-rise apartment outdoor swimming pool rebuild on the sixth floor is listed in a Houston permit filed July 3, 2024. Earlier permits cover repairs and waterproofing to a concrete roof deck and pool box, plus a residential demolition and sewer disconnect. A 2018 permit lists outdoor pergola improvements and equipment additions.
Summarized from City of Houston records · updated Jul 3, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Jul 3, 2024
- since Oct 23, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2024 · no recent filingsHi-rise apt new (re-build) outdr swmmg pool on fl 6
- Building permitJul 3, 2024
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
4 projectsSources: City of Houston
Questions about 4899 Montrose Blvd
What is being built at 4899 Montrose Blvd?
A Houston permit describes rebuilding an outdoor swimming pool on the sixth floor of a high-rise apartment building. Permit 24005351 was filed July 3, 2024.
Is a new apartment building being built at 4899 Montrose Blvd?
The listed permits describe work at a high-rise apartment building, including a pool rebuild and roof-deck and pool-box repairs. They do not describe construction of a new apartment building.
When was the pool rebuild permitted at 4899 Montrose Blvd?
The City of Houston filed permit 24005351 on July 3, 2024, for a high-rise apartment outdoor swimming pool rebuild on the sixth floor.
What repairs are planned at 4899 Montrose Blvd?
Permit 23094105, filed November 2, 2023, describes structural repairs and waterproofing for a concrete roof deck and pool box at a high-rise apartment building.
Was a building demolished at 4899 Montrose Blvd?
A City of Houston demolition permit filed September 19, 2023, describes residential demolition and a sewer disconnect. The record does not give further details about the demolition.
What's being built near Joy Development School at 1 Chelsea Blvd?
At 4899 Montrose Blvd, about 160 meters from Joy Development School, a July 2024 permit describes rebuilding an outdoor pool on the sixth floor of a high-rise apartment building.
Also being built nearby
All of 77006- 242 Portland StSep 6, 2019Demolition res/sewer disc · 47 m away
- 79 Chelsea BlvdMar 5, 2021Residential repair per spec list · 62 m away
- 4911 Montrose BlvdJun 18, 2026Demolition bld/sewer disc · 86 m away
- 238 Portland StSep 6, 2019Demolition res/sewer disc · 88 m away
- 235 Portland StSep 14, 2017Residential repairs as per spec list · 98 m away
- 234 Portland StSep 6, 2019Demolition res/sewer disc · 103 m away
- 4720 Montrose BlvdJun 18, 2018(epr) paintbooth in exstng auto repair shop · 109 m away
- 4 Chelsea BlvdApr 10, 2017(epr)prtl change of use to private bar 100%sp · 114 m away
- 220 Portland StSep 6, 2019Demolition res/sewer disc · 118 m away
- 1010 Banks StNov 15, 2022Commercial foundation repair only · 121 m away
- 207 Portland StApr 13, 20174-story single-family residence with attached gar -13r) · 122 m away
- 205 Portland StApr 13, 20174-story single-family residence with attached gar -13r) · 124 m away
More apartments & multifamily in 77006, demolitions in 77006, pools in 77006.