2101 Winter St
Houston, TX 77007
2101 Winter St: 2 projects on record
City of Houston lists 2 filings across 2 projects at 2101 Winter St, Houston, TX 77007 since April 25, 2023. The most recent, filed April 26, 2023, covers: “Repair existing 75,000 sq ft whse. building. art studios”.
Compiled from City of Houston records · updated Apr 26, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Apr 26, 2023
- since Apr 25, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2023 · no recent filingsRepair existing 75,000 sq ft whse. building. art studios
- Building permitApr 26, 2023
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
2 projectsSources: City of Houston
Questions about 2101 Winter St
What is being built at 2101 Winter St?
The latest filing (City of Houston permit 23038491, April 26, 2023) covers repair existing 75,000 sq ft whse. building. art studios.
How many permits and filings does 2101 Winter St have?
2 filings across 2 projects, from April 25, 2023 to April 26, 2023.
What is being built near Velocity Sim Racing in Houston?
2101 Winter St is about 87 m from Velocity Sim Racing (2110 Edwards St). Its latest filing is for repair existing 75,000 sq ft whse. building. art studios.
Is there other construction near 2101 Winter St?
Yes. Nearby filings include 2110 Edwards St (3277 sq ft expan. to exit indr sim racing, Apr 2, 2026); 2150 Edwards St (2458 sq ft restaurant with bar buildout, Aug 25, 2021); 2000 Edwards St (warehouse repair per spec list, Jun 17, 2026).
How do I get alerts for new permits at 2101 Winter St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77007- 2110 Edwards St · Velocity Sim RacingApr 2, 20263277 sq ft expan. to exit indr sim racing · 87 m away
- 2150 Edwards StAug 25, 20212458 sq ft restaurant with bar buildout · 105 m away
- 2000 Edwards St · Silver Street Holdings LLCJun 17, 2026Warehouse repair per spec list · 109 m away
- 2101 Summer StJun 7, 201828,258 sq ft new brewery/mix use 100% · 119 m away
- 2202 Edwards StMay 30, 2019Wharehouse interior demolition · 129 m away
- 2305 Summer StNov 6, 20232,100 s.f. salon buildout · 131 m away
- 2305 Summer St FpJul 25, 2022Fire pump room, fire pump room · 131 m away
- 2305 Summer St GargJul 6, 202198,736 sq ft garage podium build-out / (4/5) · 131 m away
- 2305 Summer St CnpyJul 6, 20211,200 sq ft canopy - 3rd floor amenity level (3/5) · 131 m away
- 2206 Edwards Street · Sawyer Edwards LtdFeb 9, 2026Holler brewery expansion — renovation/alteration — 1300sf tap room addition and pizza kitchen to the existing brewery and combining electrical services · 131 m away
- 2206 Edwards St · Sawyer Edwards, LtdJul 21, 20264,255 sq ft brewery expansion · 132 m away
- 2202 Summer StAug 1, 2017New sports facility with occupied roof · 134 m away