4500 Memorial Dr
Houston, TX 77007 · St Thomas High School
St. Thomas High School site has a building demolition permit
A City of Houston permit filed July 9, 2026, records building demolition and sewer disconnection at the St. Thomas High School site at 4500 Memorial Dr. Earlier permits include a parking lot improvement in 2025 and an 11,000-square-foot office remodel in 2024.
Summarized from City of Houston records · updated Jul 9, 2026
- Projects
- 8
- 13 filings
- Latest filing
- Jul 9, 2026
- since Jun 14, 2017
- Largest scope
- 11,000 sf
- Listed value
- —
Where this project stands
Permitted · trades not filed yetDemolition bld/sewer disc
- Building permitJun 30, 2026
- Trade permits
- Occupancy
Plumbing, electrical and fire subcontractors usually file next.
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 2 phone numbers
Permit & project history
8 projectsSources: City of Houston
Questions about 4500 Memorial Dr
What is happening at 4500 Memorial Dr in Houston?
A City of Houston permit filed July 9, 2026, records building demolition and sewer disconnection at the St. Thomas High School site. The permit number is 26056202.
What is being built at 4500 Memorial Dr?
The latest filing describes building demolition and sewer disconnection, not a new building. It does not identify a new use for the site.
When was the latest permit filed for 4500 Memorial Dr?
The latest listed City of Houston permit was filed July 9, 2026. Permit 26056202 describes building demolition and sewer disconnection.
What other recent work has been permitted at St. Thomas High School?
A permit filed April 11, 2025, describes sitework and paving for a parking lot improvement. A January 10, 2024, permit describes an 11,000-square-foot office remodel.
What is happening near K. Smith Homes on Fowler Street?
At 4500 Memorial Dr, the latest listed permit records building demolition and sewer disconnection at the St. Thomas High School site. The filing date was July 9, 2026.
Is St. Thomas High School building a new office at 4500 Memorial Dr?
The records include a permit for an 11,000-square-foot office remodel filed January 10, 2024. The latest listed permit, filed July 9, 2026, describes building demolition and sewer disconnection; it does not identify a new office building.
Also being built nearby
All of 77007- 112 Bethje StJul 5, 2024New 20,257 sq ft wrhse with stewk · 202 m away
- 112 Bethje Street · Depelchin Children's CenterFeb 19, 2024Depelchin childre's center - jlhvsb — new construction — two-story brick and composite metal panel clad, steel frame building, slab-on-grade, to be used as a warehouse and sorting center for donations for children · 207 m away
- 5004 Memorial Dr Bldg4May 24, 2019New 86605 sq ft apts above podium sp/ (m of 6) · 282 m away
- 5004 Memorial Dr FpMay 24, 2019New 1112 sq ft fire pump rm bldout sp/ (5 of 6) · 282 m away
- 5004 Memorial Dr GaragMay 24, 2019New 283000 sq ft garage podium building (6 of 6) · 282 m away
- 5004 Memorial Dr Bldg2May 24, 2019New 55425 sq ft apts above podium sp/ (3 of 6) · 282 m away
- 5004 Memorial Dr Bldg3May 24, 2019New 105495 sq ft apts above podium sp/ (4 of 6) · 282 m away
- 4708 Dickson StJan 24, 2023Residential repair per spec list · 284 m away
- 4810 Dickson StFeb 13, 2017Demolition res/sewer disc · 286 m away
- 4814 Dickson StFeb 13, 2017Demolition res/sewer disc · 287 m away
- 24 Tiel WayFeb 3, 2026Single-family residence. with attached garage · 304 m away
- 4602 Dickson StSep 9, 2025Demolition res/sewer disc · 308 m away
More demolitions in 77007, offices in 77007, parking structures in 77007.