groundranger
Recent · latest filing Dec 2025Commercial

5353 Memorial Drive

Houston, TX 77007

Proposed pedestrian bridge and trail at 5353 Memorial Drive

A proposed pedestrian bridge with about 4,700 square feet of trail for future connections is registered for 5353 Memorial Drive. The Texas Department of Licensing and Regulation record was filed December 16, 2025, and lists an estimated project cost of $1,865,000.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 16, 2025

Projects
1
1 filings
Latest filing
Dec 16, 2025
since Dec 16, 2025
Largest scope
4,700 sf
Estimated cost
$1.9M
state registration

Where this project stands

Under construction

Buffalo Bayou Greenway Bridge Package (BU06C)

4,700 sq ft · $1.9M est.

  1. RegisteredDec 16, 2025
  2. Plan review
  3. ConstructionMar '26 – Dec '27
  4. Inspected
  5. Closed
39% through of a 22-month buildMar 1, 2026 → Dec 31, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Proposed pedestrian bridge with approx 4700sf of trail for future connections — n/a

    TDLR project registrationNew ConstructionReview Complete4,700 sq ft$1.9M est.
    Tenant / owner
    Buffalo Bayou Greenway Bridge Package (bu06c)
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5353 Memorial Drive

What is being built at 5353 Memorial Drive?

A TDLR project registration describes a proposed pedestrian bridge with about 4,700 square feet of trail for future connections. The record is project TABS2026008129.

When was the pedestrian bridge project filed?

The TDLR registration was filed December 16, 2025. Its listed status is Review Complete.

How much trail is included in the project?

The registration lists approximately 4,700 square feet of trail for future connections.

What is the estimated cost of the 5353 Memorial Drive project?

The TDLR record lists an estimated project cost of $1,865,000. This is the applicant's estimate for the project.

Is a pedestrian bridge proposed near Blue Tide on Memorial Drive?

A proposed pedestrian bridge and trail project is registered at 5353 Memorial Drive, about 60 meters from Blue Tide at 5300 Memorial Drive.

What is the project number for the Buffalo Bayou Greenway bridge?

The TDLR registration number is TABS2026008129. The project is named Buffalo Bayou Greenway Bridge Package (BU06C).

Also being built nearby

All of 77007
Email me when it passes inspection