6400 Washington Ave
Houston, TX 77007
Permits show a high-rise apartment project at 6400 Washington
Houston permits indicate a high-rise apartment project at 6400 Washington Ave, including demolition work and a tower crane foundation permit filed in 2019. Permits filed in 2020 cover a swimming pool, a third-floor pool gazebo and new commercial masonry walls.
Summarized from City of Houston records · updated Jul 2, 2020
- Projects
- 5
- 5 filings
- Latest filing
- Jul 2, 2020
- since Jan 25, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2020 · no recent filingsCommercial new masonry walls, 3 segements
- Building permitJul 2, 2020
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
5 projectsSources: City of Houston
Questions about 6400 Washington Ave
What is being built at 6400 Washington Ave?
Houston permits indicate a high-rise apartment project. Records also show permits for a swimming pool, a pool gazebo and masonry walls.
When were permits filed for 6400 Washington Ave?
The earliest listed filing is a demolition permit dated January 25, 2019. The latest is for commercial masonry walls, filed July 2, 2020.
Is there a pool planned at 6400 Washington Ave?
A City of Houston permit for a new commercial swimming pool was filed June 30, 2020 (permit 20000153). A separate permit filed May 29, 2020, covers a 576-square-foot pool gazebo on the third floor (permit 20042578).
What does the tower crane permit at 6400 Washington mean?
The May 30, 2019, permit describes a new tower crane foundation for a high-rise apartment project (permit 19064716).
What's being built near Washington Pitstop on Washington Avenue?
Permits at 6400 Washington Ave indicate a high-rise apartment project with pool-related work. Washington Pitstop is listed nearby at 6502 Washington Avenue.
Was anything demolished at 6400 Washington Ave?
A building demolition and sewer disconnection permit was filed January 25, 2019 (permit 19003020).
Also being built nearby
All of 77007- 6424 Washington AveJan 25, 2019Demolition res/sewer disc · 36 m away
- 6434 Washington AveDec 18, 2017Demolition of interior non-load bearing walls · 56 m away
- 6403 Washington AveOct 3, 2019Demolition bld/sewer disc · 74 m away
- 6317 Hamman StJun 25, 2025Minor residential repairs, single family residential · 88 m away
- 6509 Westcott StMay 1, 2024Demolition res/sewer disc · 121 m away
- 6502 Washington Avenue · Washington Pitstop, LLCSep 24, 2025Pitstop express — new construction — the project consists of new construction of 6.109 s.f. convenience store non-sprinkled building, a non-sprinkled fuel station with a 3,150 s.f. fuel canopy and underground fuel tanks, and site improvements as noted in the plans · 122 m away
- 6552 Calder StMay 5, 2022Minor residential repairs, single family residential · 130 m away
- 6502 Washington Ave Cnpy1Jan 11, 2022Restaurant canopy #1 (799 sq ft) (2 of 3) · 135 m away
- 6502 Washington Ave Cnpy2Jan 11, 2022Restaurant canopy #1 (245 sq ft) (3/3) · 135 m away
- 6502 Washington Ave Cnpy · Pitstop ExpressMar 31, 20263,150 sq ft fuel canopy 21' (2/2) · 135 m away
- 6502 Washington Ave · Pitstop ExpressApr 14, 20266,109 sq ft new convenience store 21' (m/2) · 135 m away
- 6202 Dell StAug 7, 2017Residenital repairs per spec list · 136 m away
More apartments & multifamily in 77007, demolitions in 77007, pools in 77007.