groundranger
Historic · latest filing Apr 2025Commercial

1111 North Loop West

Houston, TX 77008 · Apara Autism Center, Aspire Commercial

Apara Autism Center interior renovation registered in Houston

A 7,346-square-foot interior renovation for Apara Autism Center was registered on September 16, 2026, at the multi-tenant commercial building at 1111 North Loop West. The TDLR filing describes tenant lease space within an existing building. The applicant's estimated project cost is $324,000.

Summarized from Texas Department of Licensing and Regulation, City of Houston records · updated Apr 22, 2025

Projects
3
4 filings
Latest filing
Apr 22, 2025
since Mar 17, 2022
Largest scope
—
Estimated cost
$324K
state registration

Where this project stands

Under construction

Apara Autism Center

7,346 sq ft · $324K est.

  1. RegisteredSep 16, 2026
  2. Plan review
  3. ConstructionSep '26 – Feb '27
  4. Inspected
  5. Closed
36% through of a 5-month buildSep 30, 2026 → Feb 15, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

3 projects
  1. Apara Autism Center

    Interior commercial renovation located within an exiting commercial building for tenant lease space. — park central plaza

    TDLR project registrationRenovation/AlterationReview Complete7,346 sq ft$324K est.
    Tenant / owner
    Apara Autism Center
    Design firm
    Pro
    Contact
    Pro
  2. Ppr- minor 625 sq ft remodel

    City of Houston permitPlumbingBuilding
    Project
    25037994
    Tenant / owner
    Aspire Commercial
    Contractor
    Pro
    Contact
    Pro

    PPR- MINOR 625 SQ. FT. REMODEL 1-11-1-B-B 2021 IBC

  3. Rem. existing 1,208 sq ft core corridor spr

    City of Houston permitBuilding
    Project
    21125557
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    REM. EXISTING 1,208 SQ. FT. CORE CORRIDOR 1-11-1-B-B SPR. '12 IBC

Sources: Texas Department of Licensing and Regulation · City of Houston

Questions about 1111 North Loop West

What is being built at 1111 North Loop West?

A TDLR filing describes a 7,346-square-foot interior renovation for tenant lease space in the existing multi-tenant commercial building. It names Apara Autism Center as the project.

Is Apara Autism Center opening at 1111 North Loop West?

Apara Autism Center is named in a September 16, 2026 TDLR registration for an interior renovation. The filing does not state an opening date.

How much will the renovation at 1111 North Loop West cost?

The applicant estimated the project cost at $324,000 in the TDLR registration. This is an estimate for the project, not a reported permit valuation.

When was work at 1111 North Loop West permitted?

The latest listed filing is a TDLR project registration dated September 16, 2026, for the Apara Autism Center renovation. Houston permits also list a 625-square-foot minor remodel dated April 22, 2025, and a corridor permit dated March 17, 2022.

What other work has been permitted at 1111 North Loop West?

A Houston permit dated April 22, 2025, describes a minor 625-square-foot remodel and lists Aspire Commercial. A March 17, 2022 permit describes work on an existing 1,208-square-foot core corridor.

What's being remodeled near Edward Jones on North Loop West?

The TDLR filing lists a 7,346-square-foot interior renovation for Apara Autism Center at 1111 North Loop West. Edward Jones is listed at 1225 North Loop West, 167 meters away.

Also being built nearby

All of 77008
Email me when it passes inspection