groundranger
Historic · latest filing Oct 2020Residential

808 Crawford St Garag

Houston, TX 77010

High-rise parking garage permitted at 808 Crawford St

A City of Houston permit indicates a 209,351-square-foot high-rise parking garage at 808 Crawford St, covering floors 2 through 12. The permit was filed on October 7, 2020, under permit number 20037955.

Summarized from City of Houston records · updated Oct 7, 2020

Projects
1
1 filings
Latest filing
Oct 7, 2020
since Oct 7, 2020
Largest scope
209,351 sf
Listed value
—

Where this project stands

Permitted 2020 · no recent filings

Hi-rise 209351sf fl2-12 prk garage sp/ (32/34)

209,351 sq ft

  1. Building permitOct 7, 2020
  2. Trade permits
  3. Occupancy

The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.

Permit & project history

1 project
  1. Hi-rise 209351sf fl2-12 prk garage sp/ (32/34)

    City of Houston permitBuilding209,351 sq ft
    Project
    20037955
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    HI-RISE 209351SF FL2-12 PRK GARAGE 1-42-1-S2-A 12IBC SP/FA (32/34)

Sources: City of Houston

Questions about 808 Crawford St Garag

What is being built at 808 Crawford St in Houston?

A City of Houston permit describes a 209,351-square-foot high-rise parking garage on floors 2 through 12. Permit 20037955 was filed on October 7, 2020.

When was the parking garage at 808 Crawford permitted?

The permit was filed on October 7, 2020. The record lists permit number 20037955.

How large is the garage planned for 808 Crawford St?

The permit describes a 209,351-square-foot high-rise parking garage.

What is being built near the Hampton Inn at 710 Crawford St?

A permit at 808 Crawford St, about 87 meters from the Hampton Inn at 710 Crawford St, describes a 209,351-square-foot high-rise parking garage. It was filed on October 7, 2020.

Is a rooftop pool planned at 808 Crawford St?

A separate nearby activity record for 808 Crawford St describes a new high-rise rooftop swimming pool on the 43rd floor, filed on February 3, 2022.

Also being built nearby

All of 77010
Email me when a new permit is filed