331 N Burr St
Houston, TX 77011
331 N Burr St: 1 project on record
City of Houston lists 1 filing across 1 project at 331 N Burr St, Houston, TX 77011. The most recent, filed September 4, 2019, covers: “Residential repair per spec list”.
Compiled from City of Houston records · updated Sep 4, 2019
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2019
- since Sep 4, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2019 · no recent filingsResidential repair per spec list
- Building permitSep 4, 2019
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 331 N Burr St
What is being built at 331 N Burr St?
The latest filing (City of Houston permit 19106520, September 4, 2019) covers residential repair per spec list.
How many permits and filings does 331 N Burr St have?
1 filing across 1 project, from September 4, 2019 to September 4, 2019.
What is being built near Harrisburg Redevelopment Authority (tirz 23) in Houston?
331 N Burr St is about 54 m from Harrisburg Redevelopment Authority (tirz 23) (4760 Avenue J). Its latest filing is for residential repair per spec list.
Is there other construction near 331 N Burr St?
Yes. Nearby filings include 334 N Burr St (residential addition/remodel, May 3, 2017); 4760 Avenue J (sidewalk improvements with precinct 2 — new construction — project consists of sidewalk and ramp improvements in an area predominantly without sidewalks, Mar 20, 2025); 402 N Burr St (residential repair, Jan 8, 2026).
How do I get alerts for new permits at 331 N Burr St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77011- 334 N Burr StMay 3, 2017Residential addition/remodel · 47 m away
- 4760 Avenue J · Harrisburg Redevelopment Authority (tirz 23)Mar 20, 2025Sidewalk improvements with precinct 2 — new construction — project consists of sidewalk and ramp improvements in an area predominantly without sidewalks · 54 m away
- 402 N Burr StJan 8, 2026Residential repair · 79 m away
- 4807 Avenue IFeb 2, 2023Residential duplex remodel · 91 m away
- 207 Lockwood DrMay 6, 202133s residential remodel and addition · 98 m away
- 202 Lockwood DrOct 30, 2023Convert to shell building (futr rtl) · 99 m away
- 308 N Stiles StFeb 8, 2019Resid foundation repairs (block & base/level & shim) · 109 m away
- 316 N Stiles StNov 4, 2019(epr) single-family residence with attached gar / (mst of 2) · 115 m away
- 409 N Stiles StApr 12, 2021Residential repair per spec list · 118 m away
- 222 Blanche StAug 19, 2024Sq ft residential interior remodel · 119 m away
- 4806 Avenue IMay 27, 2022Sq ft residential solar panel addition · 125 m away
- 408 N Stiles St · North Bryan Property Llc.Nov 10, 2025Single-family residence with attached garage · 132 m away