groundranger
Historic · latest filing Sep 2024Commercial

7825 Harrisburg Blvd

Houston, TX 77012

Fire Station 22 to get a second-floor egress stairway

A new exit door and egress stairway are planned for the second-floor locker room at HFD Fire Station 22, leading to a concrete pad at ground level. The Texas Department of Licensing and Regulation registered the 200-square-foot project on September 17, 2026, with an applicant-estimated cost of $50,000. Houston permits also show vehicle exhaust system installation at the station in September 2024 and a remodel permit in January 2019.

Summarized from Texas Department of Licensing and Regulation, City of Houston records · updated Sep 9, 2024

Projects
4
4 filings
Latest filing
Sep 9, 2024
since Jan 28, 2019
Largest scope
—
Estimated cost
$50K
state registration

Where this project stands

In state plan review

HFD Fire Station 22 2nd Floor Egress Door

200 sq ft · $50K est.

  1. RegisteredSep 17, 2026
  2. Plan reviewnow
  3. ConstructionOct '26 – Dec '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

4 projects
  1. Install an exit door to a new egress stairway from the second-floor locker room to a concrete pad at ground level. — hfd fire station 22

    TDLR project registrationAdditions to Existing BuildingProject Registered200 sq ft$50K est.
    Tenant / owner
    Hfd Fire Station 22 2nd Floor Egress Door
    Design firm
    Pro
    Contact
    Pro
  2. Fire station vehicle exhaust system install (2/2)

    City of Houston permitBuilding
    Project
    24035005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    FIRE STATION VEHICLE EXHAUST SYSTEM INSTALL '21 IBC (2/2)

  3. Fire station vehicle exhaust system install (m/2)

    City of Houston permitBuilding
    Project
    24035004
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    FIRE STATION VEHICLE EXHAUST SYSTEM INSTALL '21 IBC (M/2)

  4. Fire station remodel

    City of Houston permitBuilding
    Project
    16038577
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    FIRE STATION REMODEL 1-1-5-B-B '12 IBC

Sources: Texas Department of Licensing and Regulation · City of Houston

Questions about 7825 Harrisburg Blvd

What is being built at 7825 Harrisburg Blvd?

A new exit door and egress stairway are planned from the second-floor locker room at HFD Fire Station 22 to a concrete pad at ground level.

When was the Fire Station 22 egress project registered?

The Texas Department of Licensing and Regulation registered the project on September 17, 2026. The registration is TABS2027001257.

How much will the Fire Station 22 project cost?

The TDLR registration lists an applicant-estimated project cost of $50,000. This is an estimate, not a reported final cost.

How large is the Fire Station 22 egress project?

The TDLR registration lists the project at 200 square feet.

What other work has been permitted at 7825 Harrisburg Blvd?

Houston permits dated September 9, 2024, describe vehicle exhaust system installation at the fire station (permit numbers 24035004 and 24035005). A January 28, 2019, permit describes a fire station remodel.

Also being built nearby

All of 77012
Email me when plan review is complete