12302 Coulson St
Houston, TX 77015
New elementary school permits at 12302 Coulson St
City of Houston permits filed in September 2021 indicate construction of a new elementary school at 12302 Coulson St. The records describe school buildings of 64,878 and 39,595 square feet. A demolition permit was filed on March 8, 2023.
Summarized from City of Houston records · updated Mar 8, 2023
- Projects
- 4
- 4 filings
- Latest filing
- Mar 8, 2023
- since Sep 23, 2021
- Largest scope
- 64,878 sf
- Listed value
- —
Where this project stands
Permitted 2023 · no recent filingsDemolition bld/sewer disc
- Building permitMar 8, 2023
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
4 projectsSources: City of Houston
Questions about 12302 Coulson St
What is being built at 12302 Coulson St in Houston?
City permits indicate construction of a new elementary school. Two September 2021 building records describe areas of 64,878 and 39,595 square feet.
When were the elementary school permits filed?
The City of Houston filed building permits on September 28 and September 30, 2021. The permits are numbered 21021802 and 21065030.
How large is the new school at 12302 Coulson St?
The permit records describe a 64,878-square-foot school building and a 39,595-square-foot school building. They do not identify a combined project area.
Was there a demolition permit for 12302 Coulson St?
Yes. A City of Houston demolition permit, number 23012566, was filed on March 8, 2023. Its description says “Demolition bld/sewer disc.”
What school construction permits are listed for 12302 Coulson St?
The records include permits 21021802 and 21065030, both filed in September 2021, for new elementary school construction. A separate school partial demolition record, number 21076692, was filed September 23, 2021.
Also being built nearby
All of 77015- 12302 Coulson St Cnpy1Sep 28, 2021400 sq ft school entry outdoor dining(3/5)
- 12302 Coulson St T-17Jul 29, 2021Demolition temp school building/no sewer disc required
- 12302 Coulson St Cnpy3Sep 28, 2021500 sq ft entry canopy (5/5)
- 12302 Coulson St T-54Jul 29, 2021Demolition temp school building/no sewer disc required
- 12302 Coulson St Cnpy2Sep 30, 2021116 sq ft school outdoor reading trellis (4/5)
- 12319 Coulson StAug 10, 2021Residential remodel/repair · 58 m away
- 12333 Coulson StJan 31, 2019Residential repair per spec list · 132 m away
- 1336 Hiller StApr 23, 2019Residential repair as per spec sheet · 145 m away
- 12011 Coulson CirDec 29, 2025Single-family residence with no garage · 210 m away
- 1615 Hiller StJun 20, 2024Residential 2024 derecho storm damage repair · 228 m away
- 1403 Maryknoll DrNov 18, 2025Sq ft residential solar panel addition · 235 m away
- 12019 Coulson CirMar 4, 2022Repair, single family residential · 235 m away