646 West Cross Dr
Houston, TX 77018
646 West Cross Dr: 1 project on record
City of Houston lists 1 filing across 1 project at 646 West Cross Dr, Houston, TX 77018. The most recent, filed March 28, 2019, covers: “Residential repair per spec list”.
Compiled from City of Houston records · updated Mar 28, 2019
- Projects
- 1
- 1 filings
- Latest filing
- Mar 28, 2019
- since Mar 28, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2019 · no recent filingsResidential repair per spec list
- Building permitMar 28, 2019
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 646 West Cross Dr
What is being built at 646 West Cross Dr?
The latest filing (City of Houston permit 19036501, March 28, 2019) covers residential repair per spec list.
How many permits and filings does 646 West Cross Dr have?
1 filing across 1 project, from March 28, 2019 to March 28, 2019.
What is being built near Cwp Asset Corp. Dba Mister Car Wash in Houston?
646 West Cross Dr is about 47 m from Cwp Asset Corp. Dba Mister Car Wash (640 W Crosstimbers St). Its latest filing is for residential repair per spec list.
Is there other construction near 646 West Cross Dr?
Yes. Nearby filings include 640 W Crosstimbers St (parking lot improvements, Oct 7, 2025); 640 Crosstimbers (mcw - site improvements — renovation/alteration — scope of work includes maintenance of existing pavement, pavement markings, proposed vacuum stalls, vacuum pump enclosure and storm restrictors. the existing concrete parking lot to be demolished and replaced at existing grades. only the parking lot, Apr 28, 2025); 641 W Crosstimbers St Blda1 ((3/7) 117,694 sq ft new apartments 100%, Feb 24, 2022).
How do I get alerts for new permits at 646 West Cross Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77018- 640 W Crosstimbers St · Cwp Asset Corp. Dba Mister Car WashOct 7, 2025Parking lot improvements · 47 m away
- 640 Crosstimbers · Nnn Reit INCApr 28, 2025Mcw - site improvements — renovation/alteration — scope of work includes maintenance of existing pavement, pavement markings, proposed vacuum stalls, vacuum pump enclosure and storm restrictors. the existing concrete parking lot to be demolished and replaced at existing grades. only the parking lot · 64 m away
- 641 W Crosstimbers St Blda1Feb 24, 2022(3/7) 117,694 sq ft new apartments 100% · 151 m away
- 641 W Crosstimbers St FpFeb 24, 2022(7/7) 426 sq ft new fire pump rm / / nfpa-13 · 151 m away
- 641 W Crosstimbers St GaragMar 15, 2022New 153105 sq ft apt resident parking garage · 151 m away
- 641 W Crosstimbers StJan 23, 2023Apartment new swimming pool · 151 m away
- 702 W 43rd StJun 8, 2021Residential remodel · 231 m away
- 4440 N Shepherd DrFeb 18, 2026Demolition building/sewer disc · 245 m away
- 4411 N Shepherd DrMay 25, 2021Emergency habitability repairs sub bld 2 see master 19035533 · 258 m away
- 4150 N Shepherd DrAug 7, 2018Retail remodel 100% · 277 m away
- 615 E Delz StOct 13, 2020Residential repairs as per spec list · 284 m away
- 436 Sikes StJun 22, 2023Single-family residence - no garage · 286 m away