4500 Leeland St 1450 S. Lockwood
Houston, TX 77023 · City Of Houston
South Central Police Station renovation registered in Houston
A renovation of the existing two-story South Central Police Station, with parking and detention pond improvements, was registered on December 23, 2025. The building is listed at about 28,200 square feet, and its address is changing from 4500 Leeland St to 1450 S. Lockwood. The applicant’s estimated project cost is $22 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 23, 2025
- since Dec 23, 2025
- Largest scope
- 28,200 sf
- Estimated cost
- $22M
- state registration
Where this project stands
In state plan reviewSouth Central Police Station
28,200 sq ft · $22M est.
- RegisteredDec 23, 2025
- Plan reviewnow
- ConstructionMar '26 – Jul '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovate existing 2-story building that is approx 28,200 gsf. also adding parking and detention pond improvements. address shall change from 4500 leeland to 1450 s. lockwood. verbal approval was recieved by addressing department on 12-19-2025. — south central police station
TDLR project registrationRenovation/AlterationProject Registered28,200 sq ft$22M est.- Project #
- TABS2026008854
- Tenant / owner
- South Central Police Station
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4500 Leeland St 1450 S. Lockwood
What is being built at 4500 Leeland St in Houston?
The South Central Police Station is slated for renovation, with parking and detention pond improvements. The project was registered with TDLR on December 23, 2025, under project number TABS2026008854.
What is happening at 1450 S. Lockwood in Houston?
The existing South Central Police Station is being renovated, with parking and detention pond improvements. The project record says the address is changing from 4500 Leeland St to 1450 S. Lockwood.
Is a new police station being built at 4500 Leeland?
The TDLR registration describes renovation of an existing two-story building, not a new station. The building is approximately 28,200 square feet.
When was the South Central Police Station renovation registered?
The project was registered on December 23, 2025. Its TDLR project number is TABS2026008854.
How much will the South Central Police Station renovation cost?
The applicant’s estimated cost for the project is $22 million. This is an estimate, not a reported final cost.
What is being renovated near The Line Drive in Houston?
The South Central Police Station is slated for renovation, with parking and detention pond improvements. The project is registered at 4500 Leeland St, about 145 meters from The Line Drive at 1475 Ernestine Street.
Also being built nearby
All of 77023- 4437 Leeland StJul 29, 2024Residential 604 sq ft garage addition · 57 m away
- 4436 Bell StJan 5, 2021Residential repairs per spec list · 95 m away
- 4426 Bell StApr 22, 2022Minor residential repairs, duplex · 116 m away
- 4417 Leeland StJun 9, 2025Residential foundation repairs installing (12 push piers) · 126 m away
- 4416 Leeland StSep 12, 2019Residential foundation repair · 139 m away
- 1475 Ernestine Street · Christonia LLCMay 22, 2026The line drive — new construction — the project consist of an indoor baseball training facility that contains a little league field with no spectator seating and batting cages for practice · 145 m away
- 4435 Jefferson StJul 12, 2023New residential carpot/deck · 149 m away
- 1475 Ernestine StMay 14, 2024Demolition building/sewer disc · 154 m away
- 4416 Bell StJan 17, 2025New residential solar panels · 154 m away
- 4418 Pease St · Pompa Investments LLCJan 13, 2026Apt stair repairs · 167 m away
- 4406 Leeland StSep 5, 2019Residential interior remodel/repair · 169 m away
- 4431 Jefferson StMay 12, 2026Residential garage conversion · 169 m away