4501 Woodway Dr
Houston, TX 77024
Arboretum bridge, trails and nature center work permitted
City of Houston permits at 4501 Woodway Dr record improvements at the arboretum and nature center, including a pedestrian bridge, granite trails, a maintenance facility and an administrative office. The first listed permit was filed July 24, 2018, and the latest was filed June 18, 2020, for a nature center ground addition.
Summarized from City of Houston records · updated Jun 18, 2020
- Projects
- 7
- 7 filings
- Latest filing
- Jun 18, 2020
- since Jul 24, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2020 · no recent filingsNature center ground addition
- Building permitJun 18, 2020
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
7 projectsSources: City of Houston
Questions about 4501 Woodway Dr
What is being built at 4501 Woodway Dr?
City permits record arboretum and nature center improvements, including a pedestrian bridge, boardwalk, granite trails, a maintenance facility and an administrative office. The latest listed permit, 19110193, was filed June 18, 2020, for a nature center ground addition.
When were the projects at 4501 Woodway Dr permitted?
The listed City of Houston permits span July 24, 2018, through June 18, 2020. The records include seven permits.
What does permit 19110193 cover?
Permit 19110193, filed June 18, 2020, describes a nature center ground addition.
Was a new office building permitted at the arboretum?
Yes. Permit 18101226, filed January 23, 2019, describes a new administrative office building with 100% sprinkler coverage.
Was a pedestrian bridge permitted at 4501 Woodway Dr?
Yes. Permit 18032585, filed July 24, 2018, describes a new arboretum pedestrian bridge.
What work was permitted near Houston Arboretum & Nature Center?
Permits at 4501 Woodway Dr include nature center renovations and landscape improvements, plus a new arboretum boardwalk and granite trails. A later filing dated June 29, 2026, describes proposed Woodway Oval enhancements, including an accessible sidewalk connection, boardwalk and shade canopy.
Also being built nearby
All of 77024- 4501 Woodway Drive · Houston Arboretum & Nature CenterJun 29, 2026Houston arboretum woodway oval enhancements — renovation/alteration — the proposed scope includes accessible sidewalk connection, boardwalk, prefabricated shade canopy, special paving, tree protection & preservation, selective demolition, grading, storm drainage, and swppp · 399 m away
- 7575 N Picnic LnAug 15, 20233,297 sq ft cafe buildout · 457 m away
- 109 N Post Oak Lane · The Redstone Building LPJul 24, 2024Schlanger silver — renovation/alteration — interior upgrades of existing law office space · 566 m away
- 111 North Post Oak · Houstonian Campus, LLCJan 13, 2026Prefunction amenity deck addition — renovation/alteration — 2,500 sq ft outdoor amenity deck adjacent to the existing grande ballroom prefunction space within the houstonian hotel conference center. the deck will include a fireplace and hearth with a protective guardrail around the entire perimeter · 567 m away
- 111 North Post Oak Lane · The Houstonian Hotel, Club, And SpaJun 24, 2024The houstonian conference center renovation — renovation/alteration — a 50,000sf renovation of existing meeting rooms and assembly spaces · 567 m away
- 123 N Post Oak LnSep 27, 2017Commercial harvey storm damage repairs per spec list · 575 m away
More offices in 77024.