2727 West Holcombe Blvd
Houston, TX 77025 · Kelsey-Seybold Main Campus - Cardiology Expansion, Kelsey-Seybold Main Campus- Interventional Ct Suite
Kelsey-Seybold clinic expansion and renovation
A 1,500-square-foot expansion and renovation of the existing Kelsey-Seybold Main Campus clinic is planned at 2727 West Holcombe Blvd. The project was registered with the Texas Department of Licensing and Regulation on February 12, 2026, with an applicant-estimated cost of $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 12, 2026
- since Jun 12, 2024
- Largest scope
- 6,000 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
Under constructionKelsey-Seybold Main Campus - Cardiology Expansion
1,500 sq ft · $300K est.
- RegisteredFeb 12, 2026
- Plan review
- ConstructionApr '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsExpansion and renovation of an existing clinic. — kelsey-seybold main campus clinic
TDLR project registrationRenovation/AlterationReview Complete1,500 sq ft$300K est.- Project #
- TABS2026012517
- Tenant / owner
- Kelsey-Seybold Main Campus - Cardiology Expansion
- Design firm
- Pro
- Contact
- Pro
Renovation of an existing infusion suite into an interventional ct suite within a medical office building. — kelsey-seybold main campus clinic
TDLR project registrationRenovation/AlterationProject Closed6,000 sq ft$1.4M est.- Project #
- TABS2024020697
- Tenant / owner
- Kelsey-Seybold Main Campus- Interventional Ct Suite
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2727 West Holcombe Blvd
What is being built at 2727 West Holcombe Blvd?
The project is an expansion and renovation of the existing Kelsey-Seybold Main Campus clinic, focused on cardiology. The TDLR registration lists 1,500 square feet of work.
When was the Kelsey-Seybold cardiology expansion filed?
The project was registered with the Texas Department of Licensing and Regulation on February 12, 2026. Its registration number is TABS2026012517.
How much will the Kelsey-Seybold clinic renovation cost?
The TDLR registration lists an applicant-estimated project cost of $300,000.
Is a new clinic being built at 2727 West Holcombe Blvd?
The registration describes an expansion and renovation of an existing clinic, not a new clinic. The project is named Kelsey-Seybold Main Campus - Cardiology Expansion.
What's being renovated near Belmont Village on West Holcombe?
A 1,500-square-foot expansion and renovation of the Kelsey-Seybold Main Campus clinic was registered at 2727 West Holcombe Blvd. Belmont Village is listed about 299 meters away.
What is the status of the Kelsey-Seybold cardiology expansion?
The TDLR project registration lists its status as Review Complete. The registration was filed on February 12, 2026.
Also being built nearby
All of 77025- 2727 W Holcombe BlvdJul 13, 2026(2/2) 806 sq ft lab/off. remodel · 115 m away
- 2617 W Holcombe BlvdNov 18, 20201,500 sq ft restaurant remodel · 147 m away
- 2200 Edwards StAug 9, 202113,182 sq ft (5679+7503) beauty salon expansion sp · 173 m away
- 2727 Gramercy Street Level 1 · Hca HealthcareAug 21, 2026Hca gramercy asc renovation - package 2 — renovation/alteration — interior remodel to existing recovery and pre-op spaces, and staff lounge and finish updates, with revision to the exterior canopy and patient drop off and pick up · 233 m away
- 2727 Gramercy St · Gramercy Surgerycenter LtdSep 10, 2025Hca gramercy asc renovation — renovation/alteration — renovation of the existing first floor space of approx 15,120 sq ft of an existing group occupancy i condition 2, ambulatory surgical center, located on level 1. interior remodeling with minor revisions to the exterior canopy and drop-off/pick-up area · 233 m away
- 2727 Gramercy St · Hca Gramercy AscOct 26, 20264,412 sq ft surgery center remodel · 249 m away
- 2923 Brompton Square DrMay 5, 2017Remove & replace (1) window per spec list · 293 m away
- 2929 W Holcombe Blvd · Belmont VillageJun 16, 2026New exterior 200 kw diesel generator install · 299 m away
- 2943 Brompton Square DrApr 5, 2019Commercial repair per spec list · 308 m away
- 2518 Dorrington StJan 10, 20231,140 sq ft dentist office addition · 309 m away
- 2700 Bellefontaine St B-12May 18, 2026Com. condominium repairs as per spec list · 314 m away
- 2700 Bellefontaine St A-5Apr 22, 2026Residential repair per spec list · 314 m away