4140 Southwest Freeway
Houston, TX 77027 · Advanced Diagnostics Healthcare System
Fourth-floor multi-specialty clinic renovation at 4140 Southwest Freeway
A 19,385-square-foot renovation is planned for the existing fourth floor at 4140 Southwest Freeway for a multi-specialty clinic. The project was registered with TDLR on January 19, 2026, under project number TABS2026010362. The applicant’s estimated project cost is $3.1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 19, 2026
- since Jan 19, 2026
- Largest scope
- 19,385 sf
- Estimated cost
- $3.1M
- state registration
Where this project stands
In state plan reviewADH Clinic Fourth Floor
19,385 sq ft · $3.1M est.
- RegisteredJan 19, 2026
- Plan reviewnow
- ConstructionFeb '26 – Aug '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRenovation of the existing mob fourth floor to be used for a multi-specialty clinic — river oaks hospital annex bdg
TDLR project registrationRenovation/AlterationProject Registered19,385 sq ft$3.1M est.- Project #
- TABS2026010362
- Tenant / owner
- Adh Clinic Fourth Floor
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4140 Southwest Freeway
What is being built at 4140 Southwest Freeway?
A renovation of the existing fourth floor for a multi-specialty clinic is registered at the address. The TDLR filing describes 19,385 square feet of work.
When was the clinic renovation at 4140 Southwest Freeway registered?
The project was registered with TDLR on January 19, 2026. Its project number is TABS2026010362.
How much will the 4140 Southwest Freeway clinic renovation cost?
The TDLR registration lists an applicant estimate of $3.1 million for the project.
When will the clinic at 4140 Southwest Freeway open?
The TDLR registration does not provide an opening date.
What is being renovated near River Oaks Medical Tower?
A TDLR-registered project at 4140 Southwest Freeway calls for renovating the existing fourth floor for a multi-specialty clinic. The filing was dated January 19, 2026.
Also being built nearby
All of 77027- 4126 Southwest Freeway · River Oak Mob Sps, LPJan 9, 2025Medical office - suite 1000 — renovation/alteration — interior finish-out of medical office with a waiting room, business center, break room, nurse station, exam rooms, offices, storage, a treatment room and a restroom · 22 m away
- 4126 Southwest Fwy · River Oaks Medical TowerMar 11, 2026Hi-rise corridor and bathroom rem · 45 m away
- 4100 Southwest Freeway · Westdale Houston 4100 Southwest LPFeb 29, 2024The grand at upper kirby - gym remodel — renovation/alteration — remodel of the lobby, gym and restrooms · 64 m away
- 4426 Southwest FwyAug 9, 2022Rehab of water well facility, water well facility (16/17) · 71 m away
- 4140 Southwest Fwy · Advanced DiagnostichealthcareJun 24, 202620,206 sq ft clinic remodel · 75 m away
- 3802 Las Palmas StApr 23, 2026Residential addition · 105 m away
- 4120 Southwest Fwy · Genesis Back & Neck River OaksJun 3, 20261,664 sq ft medical office remodel · 106 m away
- 4200 Twelve Oaks DrMay 6, 2021Office/clinic buildout 2012 (2/2 - 20031690) · 131 m away
- 4123 Norfolk StSep 29, 2025New residential swimming pool only · 136 m away
- 3734 Las Palmas StSep 25, 2024New residential solar panels battery addition · 149 m away
- 4201 Southwest FwyMar 6, 2017Extr building remodel with prkg lot upgrade 100% · 150 m away
- 3810 Drexel Dr Cnpy2Nov 5, 2020190 sq ft landscape area canopy / (7/7) · 169 m away