1025 Holcombe Blvd
Houston, TX 77030
1025 Holcombe Blvd: 1 project on record
City of Houston lists 1 filing across 1 project at 1025 Holcombe Blvd, Houston, TX 77030. The most recent, filed August 16, 2021, covers: “(epr) one new light pole & exterior lighting upgrades”.
Compiled from City of Houston records · updated Aug 16, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Aug 16, 2021
- since Aug 16, 2021
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2021 · no recent filings(epr) one new light pole & exterior lighting upgrades
- Building permitAug 16, 2021
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 1025 Holcombe Blvd
What is being built at 1025 Holcombe Blvd?
The latest filing (City of Houston permit 19018824, August 16, 2021) covers (epr) one new light pole & exterior lighting upgrades.
How many permits and filings does 1025 Holcombe Blvd have?
1 filing across 1 project, from August 16, 2021 to August 16, 2021.
What is being built near The Board Of Regents Of The Texas A&m University System in Houston?
1025 Holcombe Blvd is about 77 m from The Board Of Regents Of The Texas A&m University System (1020 Holcombe Boulevard). Its latest filing is for (epr) one new light pole & exterior lighting upgrades.
Is there other construction near 1025 Holcombe Blvd?
Yes. Nearby filings include 1020 Holcombe Boulevard (innovation plaza - infrastructure remediation — renovation/alteration — removal of existing electrical duct-bank and re-routing of secondary conduit. enclosure of existing equipment for security and maintenance access, Jun 15, 2025); 1020 Holcombe Blvd, Level 8 (23.3320 alkek ibt building lab expansion renovation & enmed build-out (l8 enmed) — renovation/alteration — interior build-out of an existing multistory (16 floors) high rise sprinklered building on level 8. a majority of floor build-out includes administrative private offices, breakroom, conference and storage. restrooms and janitor for entire floor use, May 29, 2026); 1020 Holcombe Blvd., Houston, Texas 77030 (enmed level 17 -pettigrew office suite — renovation/alteration — scope of the work of this project is converting existing 794 sq ft conference room in to two offices and converting existing 137 sq ft storage room in to office, Dec 17, 2024).
How do I get alerts for new permits at 1025 Holcombe Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77030- 1020 Holcombe Boulevard · The Board Of Regents Of The Texas A&m University SystemJun 15, 2025Innovation plaza - infrastructure remediation — renovation/alteration — removal of existing electrical duct-bank and re-routing of secondary conduit. enclosure of existing equipment for security and maintenance access · 77 m away
- 1020 Holcombe Blvd, Level 8 · Board Of Regents Texas A&m University SystemMay 29, 202623.3320 alkek ibt building lab expansion renovation & enmed build-out (l8 enmed) — renovation/alteration — interior build-out of an existing multistory (16 floors) high rise sprinklered building on level 8. a majority of floor build-out includes administrative private offices, breakroom, conference and storage. restrooms and janitor for entire floor use · 77 m away
- 1020 Holcombe Blvd., Houston, Texas 77030 · Texas A&m University SystemDec 17, 2024Enmed level 17 -pettigrew office suite — renovation/alteration — scope of the work of this project is converting existing 794 sq ft conference room in to two offices and converting existing 137 sq ft storage room in to office · 77 m away
- 1020 Holcombe Blvd · Texas A&m University SystemApr 29, 2025Enmed discovery tower labs & office buildout -elevator removal — renovation/alteration — removal of an existing elevator on levels 16&17 in enmed building and build out one new office on level 16 · 77 m away
- 1850 Old Main StJun 5, 2018New pergola with outdoor kitchen (35th flr) · 103 m away
- 6800 Main StAug 1, 2023Hotel remodel · 104 m away
- 6910 Fannin · Metropolitan Transit Authority Of Harris County, TexasNov 25, 2024Metro tmc tc elevator replacement — renovation/alteration — four existing traction elevators will be replaced with four hydraulic elevators. as well as an addition of an electrical room and machine rooms · 139 m away
- 6750 Main St B-1Jul 23, 2018H-rise hotel basement level bldout s/a (2/20) · 139 m away
- 6750 Main StNov 20, 2018305 sq ft hotel lobby bar (bar #2) bld-out sp · 139 m away
- 6750 Main St GaragJul 23, 2018H-rise htl pkg garage lvls 2 thru 6 s/a (4/20) · 139 m away
- 6700 Fannin St · Texas Woman's University-Facilities Mgmt And ConstApr 21, 2025Twu 8th floor it relocation — renovation/alteration — 8th floor interior building renovation to accommodate the it department · 152 m away
- 6701 Fannin · Texas Children's HospitalSep 23, 2025Level 14 renovation exam rooms — renovation/alteration — convert a microscope room and small conference room into two exam rooms for tch and md anderson's outpatient cancer clinic · 159 m away