1151 Holcombe Blvd
Houston, TX 77030
1151 Holcombe Blvd: 1 project on record
City of Houston lists 1 filing across 1 project at 1151 Holcombe Blvd, Houston, TX 77030. The most recent, filed July 26, 2019, covers: “Hi rise police station remodel 100%”.
Compiled from City of Houston records · updated Jul 26, 2019
- Projects
- 1
- 1 filings
- Latest filing
- Jul 26, 2019
- since Jul 26, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2019 · no recent filingsHi rise police station remodel 100%
- Building permitJul 26, 2019
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 1151 Holcombe Blvd
What is being built at 1151 Holcombe Blvd?
The latest filing (City of Houston permit 19051315, July 26, 2019) covers hi rise police station remodel 100%.
How many permits and filings does 1151 Holcombe Blvd have?
1 filing across 1 project, from July 26, 2019 to July 26, 2019.
What is being built near Texas Children's Hospital in Houston?
1151 Holcombe Blvd is about 64 m from Texas Children's Hospital (6701 Fannin St). Its latest filing is for hi rise police station remodel 100%.
Is there other construction near 1151 Holcombe Blvd?
Yes. Nearby filings include 6701 Fannin St (114 sq ft hospital remodel, Apr 23, 2026); 6910 Fannin (metro tmc tc elevator replacement — renovation/alteration — four existing traction elevators will be replaced with four hydraulic elevators. as well as an addition of an electrical room and machine rooms, Nov 25, 2024); 1100 Bates Ave (parking garage entrance gate upgrade, May 23, 2024).
How do I get alerts for new permits at 1151 Holcombe Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77030- 6701 Fannin St · Texas Children's HospitalApr 23, 2026114 sq ft hospital remodel · 64 m away
- 6910 Fannin · Metropolitan Transit Authority Of Harris County, TexasNov 25, 2024Metro tmc tc elevator replacement — renovation/alteration — four existing traction elevators will be replaced with four hydraulic elevators. as well as an addition of an electrical room and machine rooms · 78 m away
- 1100 Bates AveMay 23, 2024Parking garage entrance gate upgrade · 86 m away
- 1220 S Holcombe · Board Of Regents- University Of Texas-Executive Director Of Real EstateSep 4, 2024Acb7 clean supply room renovation — renovation/alteration — conversion of existing space to flexible work environment for staff · 89 m away
- 1220 Holcombe Blvd · M.d Anderson Cancer CenterNov 9, 2026Acb1.1068 convert consult to exam — renovation/alteration — converting existing space from an office to an exam room that includes architectural and mep scope · 89 m away
- 6701 Fannin · Texas Children's HospitalSep 23, 2025Level 14 renovation exam rooms — renovation/alteration — convert a microscope room and small conference room into two exam rooms for tch and md anderson's outpatient cancer clinic · 122 m away
- 6701 Fannin Street · Texas Children's HospitalJun 19, 2026Level 14 renovation - lobby — renovation/alteration — the scope of work for this 3,783 sq ft project is to renovate the lobby on level 14 of mark wallace tower. the proposed lobby will include a waiting area, an arts and crafts area, and break area · 122 m away
- 6700 Fannin St · Texas Woman's University-Facilities Mgmt And ConstApr 21, 2025Twu 8th floor it relocation — renovation/alteration — 8th floor interior building renovation to accommodate the it department · 131 m away
- 1102 Bates Ave · Texas Children's HospitalAug 3, 20266,000 sq ft hospital remodel 100 % · 140 m away
- 1102 Bates Ave L-3Jul 8, 2022215 sq ft hospital equipment remodel · 140 m away
- 6950 Fannin StApr 8, 2019Sitework and foundation for future metro operator restroom · 164 m away
- 1313 Holcombe Blvd · Md Anderson Cancer CenterJun 17, 2024Mda cap plan #710175 — renovation/alteration — renovate existing rooms r1.1224 and r1.1224a for the installation of a new -80°c automated, high-density storage system, and compressor · 176 m away