6551 Bertner Ave, Level 4
Houston, TX 77030 · Houston Methodist Hospital - Tmc (walter Tower)
Houston Methodist Walter Tower to replace Cath Lab #10 equipment
Houston Methodist Walter Tower is renovating its existing Cath Lab #10 and replacing medical equipment at 6551 Bertner Ave. The TDLR project registration was filed October 22, 2025, and describes work within 1,313 square feet with no changes to interior or exterior walls. The applicant’s estimated project cost is $630,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 22, 2025
- since Oct 22, 2025
- Largest scope
- 1,313 sf
- Estimated cost
- $630K
- state registration
Where this project stands
CompletedHMWT Cath Lab #10 Equipment Replacement
1,313 sq ft · $630K est.
- RegisteredOct 22, 2025
- Plan review
- ConstructionDec '25 – May '26
- Inspected
- Closed
Ran as a 6-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe scope includes the renovation of an existing cath. lab and exchange of existing medical equipment with no changes to interior or exterior walls. — houston methodist walter tower
TDLR project registrationRenovation/AlterationProject Closed1,313 sq ft$630K est.- Project #
- TABS2026004057
- Tenant / owner
- Hmwt Cath Lab #10 Equipment Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6551 Bertner Ave, Level 4
What is being built at 6551 Bertner Ave in Houston?
The project is a renovation of an existing cath lab at Houston Methodist Walter Tower, including replacement of Cath Lab #10 equipment. It does not describe a new building.
What is happening to Cath Lab #10 at Houston Methodist Walter Tower?
The project registration says the existing cath lab will be renovated and its medical equipment replaced. It specifies no changes to interior or exterior walls.
When was the Cath Lab #10 project filed?
The TDLR registration was filed October 22, 2025. The project number is TABS2026004057.
How much will the Houston Methodist Walter Tower project cost?
The applicant’s estimated cost is $630,000. This is an estimate for the project, not a reported final cost.
How large is the Cath Lab #10 renovation?
The TDLR project registration lists 1,313 square feet for the renovation and equipment replacement.
Is a new hospital or building being constructed at 6551 Bertner Ave?
The registration describes renovation of an existing cath lab and replacement of its equipment, not construction of a new hospital or building.
What is the status of the Cath Lab #10 project?
The TDLR record lists the project status as closed.