6977 Main St
Houston, TX 77030
6977 Main St: 1 project on record
City of Houston lists 1 filing across 1 project at 6977 Main St, Houston, TX 77030. The most recent, filed May 24, 2024, covers: “Demolition bld/sewer disc”.
Compiled from City of Houston records · updated May 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 24, 2024
- since May 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2024 · no recent filingsDemolition bld/sewer disc
- Building permitMay 24, 2024
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 6977 Main St
What is being built at 6977 Main St?
The latest filing (City of Houston permit 24045470, May 24, 2024) covers demolition bld/sewer disc.
How many permits and filings does 6977 Main St have?
1 filing across 1 project, from May 24, 2024 to May 24, 2024.
What is being built near HCC Coleman College in Houston?
6977 Main St is about 157 m from HCC Coleman College (1919 Pressler St). Its latest filing is for demolition bld/sewer disc.
Is there other construction near 6977 Main St?
Yes. Nearby filings include 1900 Pressler Dr (240 sq ft productn studio remodel, Jun 14, 2023); 1919 Pressler St (14,844 sq ft school (5th flr) buildout, Oct 13, 2026); 1919 Pressler Dr (college building interior remodel, Jun 14, 2023).
How do I get alerts for new permits at 6977 Main St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77030- 1900 Pressler DrJun 14, 2023240 sq ft productn studio remodel · 68 m away
- 1919 Pressler St · HCC Coleman CollegeOct 13, 202614,844 sq ft school (5th flr) buildout · 157 m away
- 1919 Pressler DrJun 14, 2023College building interior remodel · 157 m away
- 1825 Pressler Street · Ut Health Science - HoustonJul 31, 2024Ut health - srb 305 and 306 lab renovation — renovation/alteration — renovation of existing room on level 3 to provide additional lab space to house warm cells · 169 m away
- 2121 W Holcomb · Board Of Regents Texas A&m University SystemJul 28, 202623.3320 alkek ibt building lab expansion renovation & enmed build-out (alkek) — renovation/alteration — partial renovation to existing 11 story, type 1a, sprinklered building. scope includes interior alterations to level 1, 2, 3, 4 to 7, and 11. level 2, 4-7, 11 includes extensive renovation to expand and upgrade laboratory and admin office programming · 203 m away
- 6910 Fannin St Brdge · Metropolitan Transit AuthorityMay 26, 2026Overhead pedestrian bridge remodel · 205 m away
- 6910 Fannin St · Metropolitan Transit AuthorityMay 27, 2026Exterior escalator replacement · 205 m away
- 2130 W Holcombe Blvd, Level 8 · Life Science Plaza Investment Group, LPMay 11, 2024Ctmc lsp8 qa workroom renovation — renovation/alteration — 1,310 sq ft renovation of level 8 offices spaces at life science plaza. includes demolition of partitions and electrical work. occupancy of space to remain unchanged · 211 m away
- 2130 W Holcombe Blvd · Life Science Plaza Investment Group LPOct 8, 2024Life science plaza- core and shell infill — renovation/alteration — a core and shell renovation of an existing building. this includes infill of existing openings, new elevators, new stairs and new exterior windows · 211 m away
- 1020 Holcombe Blvd · Texas A&m University SystemApr 29, 2025Enmed discovery tower labs & office buildout -elevator removal — renovation/alteration — removal of an existing elevator on levels 16&17 in enmed building and build out one new office on level 16 · 225 m away
- 1020 Holcombe Boulevard · The Board Of Regents Of The Texas A&m University SystemJun 15, 2025Innovation plaza - infrastructure remediation — renovation/alteration — removal of existing electrical duct-bank and re-routing of secondary conduit. enclosure of existing equipment for security and maintenance access · 225 m away
- 1020 Holcombe Blvd., Houston, Texas 77030 · Texas A&m University SystemDec 17, 2024Enmed level 17 -pettigrew office suite — renovation/alteration — scope of the work of this project is converting existing 794 sq ft conference room in to two offices and converting existing 137 sq ft storage room in to office · 225 m away
More demolitions in 77030.