3102 Mckaughan Road
Houston, TX 77032 · City Of Houston
IAH groundwater facility upgrades registered in 2024
Renovation work is registered for the Intercontinental-1 groundwater facility at 3102 Mckaughan Road. The Texas Department of Licensing and Regulation recorded the project on March 21, 2024; the work includes pump, piping, ventilation, drainage and building repairs.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 21, 2024
- since Mar 21, 2024
- Largest scope
- 3,817 sf
- Estimated cost
- $2.4M
- state registration
Where this project stands
In state plan reviewGround Water Facility/Re-Pump Station/HVAC & Ventilation System Improvements Pckg 3 - IAH GW
3,817 sq ft · $2.4M est.
- RegisteredMar 21, 2024
- Plan reviewnow
- ConstructionJul '24 – Oct '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectDriveway & gate entrance improvements, area drainage. replace 2 pumps & motors, replace suction and discharge header piping, coat piping, replace valves. replace louvers & fans in chemical room. replace a/c unit in elec room. repair roof & building drain — intercontinental -1 groundwater facility
TDLR project registrationRenovation/AlterationProject Registered3,817 sq ft$2.4M est.- Project #
- TABS2024014436
- Tenant / owner
- Ground Water Facility/Re-Pump Station/Hvac & Ventilation System Improvements Pckg 3 - Iah Gw
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3102 Mckaughan Road
What is being built at 3102 Mckaughan Road?
A TDLR registration describes renovations to the Intercontinental-1 groundwater facility, including pump and piping replacements, ventilation work, drainage improvements and building repairs.
When was the groundwater facility project registered?
The project was registered with TDLR on March 21, 2024. Its registration number is TABS2024014436.
What work is planned at the IAH groundwater facility?
The registration lists replacing two pumps and motors, piping and valves, as well as replacing chemical-room louvers and fans and an electrical-room air-conditioning unit. It also includes driveway, gate entrance, drainage, roof and building-drain work.
How much is the 3102 Mckaughan Road project expected to cost?
The TDLR registration lists an estimated project cost of $2,387,600. This is the applicant's estimate.
Is the project a new building or a renovation?
The TDLR record classifies it as a renovation or alteration. It describes improvements to an existing groundwater facility and re-pump station.
What work is registered near City of Houston at 18550 Airmail Road?
A groundwater facility renovation is registered at 3102 Mckaughan Road, about 84 meters from the City of Houston location at 18550 Airmail Road. The project registration is dated March 21, 2024.
Also being built nearby
All of 77032- 18550 Airmail Rd · City Of HoustonDec 5, 2025Central utility plant renovation and upgrade en03 trailer power enabling package — renovation/alteration — temporary construction trailers and supporting temporary site work · 84 m away
- 18418 Airmail RdSep 18, 2024United provisioning warehouse expansion - bsg-2023-17-iah · 131 m away
- 156002/3 John F Kennedy BlvdNov 8, 2021Upgrade roof-top cell tower equipment · 162 m away
- 3230 Pallet RdSep 11, 2024Ua cargo cctv milestone migration - bsg-2023-214-iah · 295 m away
- 18445 Security RdAug 20, 2025Roof replacement iah_mlr_d - bsg-2025-108-iah · 343 m away
- 18201 Viscount RdAug 20, 2021Central cargo g-building - bsg-2021-162-iah · 374 m away
- 153332/3 John F Kennedy BlvdDec 14, 2023Rooftop cell antenna remodel · 421 m away
- 18311 Tug Road · City Of Houston – Houston Airport System DivisionSep 24, 2026Checkpoint bravo — renovation/alteration — the project widens both checkpoint drive lanes by approximately 6 feet: the east lane serving northbound traffic and the west lane serving southbound traffic. work includes clearing and grubbing, full depth saw cutting where required, subgrade and ba · 458 m away
- 3100 N Terminal Rd · Ramp Level StorageFeb 6, 2026Health review only for bsg-2025-426-iah · 495 m away
- 3100 N Terminal B RdNov 6, 2025Ua - united comfort station - bsg-2025-65-iah · 495 m away
- 3100 N Terminal Rd Bne26Feb 6, 2026Health review only bsg-2025-425-iah · 495 m away
- 3100 N Terminal B Rd Mps BAug 15, 2025Airport health review · 495 m away