111 Fallbrook Dr
Houston, TX 77038
Wash bay equipment renovation at Metro Fallbrook
Metro Fallbrook Wash Bays is registered for replacement, repair and refinishing of wash bay equipment and select doors in an existing 14,685-square-foot building. The TDLR registration is dated December 18, 2025; a Houston permit dated November 5, 2024, covers replacement of an interior 2,000 kW diesel generator and automatic transfer switch.
Summarized from Texas Department of Licensing and Regulation, City of Houston records · updated Nov 5, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 5, 2024
- since Nov 5, 2024
- Largest scope
- —
- Estimated cost
- $5.9M
- state registration
Permit & project history
2 projectsReplacement, repair and refinish of wash bay equipment and select doors in existing 14,685sf building — metro fallbrook
TDLR project registrationRenovation/AlterationReview Complete14,685 sq ft$5.9M est.- Project #
- TABS2026008443
- Tenant / owner
- Metro Fallbrook Wash Bays
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Houston
Questions about 111 Fallbrook Dr
What is being built at 111 Fallbrook Dr?
Records indicate renovations to wash bay equipment and select doors at Metro Fallbrook Wash Bays, in an existing 14,685-square-foot building. A separate Houston permit covers replacement of an interior diesel generator and automatic transfer switch.
Is Metro Fallbrook Wash Bays a new building?
The TDLR registration describes work in an existing 14,685-square-foot building, including replacement, repair and refinishing of wash bay equipment and select doors.
When was the wash bay renovation registered?
The TDLR project registration, TABS2026008443, is dated December 18, 2025.
What does Houston permit 24090222 cover?
The City of Houston permit record dated November 5, 2024, describes replacement of an interior 2,000 kW diesel generator and automatic transfer switch.
How much is the Metro Fallbrook project estimated to cost?
The TDLR registration lists an applicant-estimated project cost of $5,935,004. This is an estimate, not a reported final cost.
What is being renovated near Chase View Apartments?
At 111 Fallbrook Dr, Metro Fallbrook Wash Bays is registered for renovation work on wash bay equipment and select doors in an existing building. The site is about 292 meters from Chase View Apartments.
Also being built nearby
All of 77038- 140 Fallbrook DrAug 2, 2017Warehouse: demolition of interior non-load bearing/non-fire rated walls · 226 m away
- 201 Plaza Verde Dr Bld19 · Chase View ApartmentsAug 10, 20261656sf apt leasing office remodel · 292 m away
- 11311 North Fwy Cnpy1Oct 20, 2021New 5,856 sq ft fuel canopy (2 of 3) · 306 m away
- 11311 North Fwy Cnpy2Oct 20, 2021New 2,784 sq ft fuel canopy (3 of 3) · 306 m away
- 11311 North FwyOct 20, 20215,334 sq ft new c-store & sitework (m/3) · 306 m away
- 11500 Green Plaza Dr Bld20Jun 24, 2022Occ report/apartment/building #20/16 units/14,496 sq ft/70 code · 377 m away
- 11500 Green Plaza Dr Bld12Sep 23, 2022Emergency habitability repairs sub bld 12 see master 19053043 · 377 m away
- 11500 Green Plaza DrSep 23, 2022Emergency habitability repairs sub bld 1 see master 19053043 · 377 m away
- 11435 North FwyAug 2, 2018Commercial repair per spec list · 402 m away
- 201 Plaza Verde Dr Bld23Jun 13, 2019Emergency habitability repairs sub bld 23 see master 19020444 · 409 m away
- 201 Plaza Verde Dr Bld22Jun 15, 2017Apartment fire damage repairs (45% fire damage) /truss plans · 409 m away
- 201 Plaza Verde Dr Bld20Jun 13, 2019Emergency habitability repairs sub bld 20 see master 19021127 · 409 m away