4755 Aldine Mail Route Rd
Houston, TX 77039 · Harris County Hospital District (hchd)
Aldine Health Center to replace radiographic equipment
A radiographic-equipment replacement and control-booth layout change are planned at the existing Aldine Health Center. The project was registered with TDLR on June 3, 2025, under project number TABS2025020410.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2025
- since Jun 3, 2025
- Largest scope
- 396 sf
- Estimated cost
- $220K
- state registration
Where this project stands
Inspected · closing outAldine Health Center Radiographic Equipment Replacement
396 sq ft · $220K est.
- RegisteredJun 3, 2025
- Plan review
- ConstructionApr '26 – Oct '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectScope includes the replacement of radiographic equipment, as well as new layout for control booth area to x-ray room in existing aldine health center. — aldine health center harris health system
TDLR project registrationRenovation/AlterationInspection Complete396 sq ft$220K est.- Project #
- TABS2025020410
- Tenant / owner
- Aldine Health Center Radiographic Equipment Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4755 Aldine Mail Route Rd
What is being built at 4755 Aldine Mail Route Road?
The project involves replacing radiographic equipment and changing the layout between the control booth and X-ray room at the existing Aldine Health Center.
When was the Aldine Health Center project registered?
The TDLR registration is dated June 3, 2025. Its project number is TABS2025020410.
Is a new health center being built in Houston 77039?
No new health center is described in the registration. It covers renovations to the existing Aldine Health Center.
How much will the Aldine Health Center equipment replacement cost?
The applicant estimated the project cost at $220,000 in the TDLR registration.
What is being upgraded near Tresmaldo on Aldine Mail Route?
The existing Aldine Health Center at 4755 Aldine Mail Route Road is slated for radiographic-equipment replacement and a control-booth layout change. Tresmaldo is listed about 468 meters away.
Is the Aldine Health Center project complete?
The TDLR record lists the project status as “Inspection Complete.”