groundranger
Historic · latest filing Dec 2024Commercial

7322 Southwest Fwy

Houston, TX 77040 · Katy Management District No. 1

Phase 3 Boardwalk District trails registered in Houston

A 12-foot-wide trail system around a detention pond and an extension connecting existing trails to Kingsland Boulevard are planned as Phase 3 of the Boardwalk District Trails project. The TDLR registration was filed on December 27, 2024, and lists the project as closed. The applicant’s estimated project cost is $2 million.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 27, 2024

Projects
1
1 filings
Latest filing
Dec 27, 2024
since Dec 27, 2024
Largest scope
17,100 sf
Estimated cost
$2.0M
state registration

Where this project stands

Completed

Phase 3 Boardwalk District Trails

17,100 sq ft · $2.0M est.

  1. RegisteredDec 27, 2024
  2. Plan review
  3. ConstructionApr '25 – Oct '25
  4. Inspected
  5. Closed

Ran as a 7-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Scope of work of the contract includes the construction of a 12-foot-wide trail system around a detention pond, and a new trail extension connecting the existing trails to kingsland boulevard. — boardwalk district trails

    TDLR project registrationNew ConstructionProject Closed17,100 sq ft$2.0M est.
    Tenant / owner
    Phase 3 Boardwalk District Trails
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 7322 Southwest Fwy

What is being built at 7322 Southwest Fwy in Houston?

A TDLR project registration describes a 12-foot-wide trail system around a detention pond, plus a trail extension connecting existing trails to Kingsland Boulevard. The registration for Phase 3 Boardwalk District Trails was filed December 27, 2024.

What is the Phase 3 Boardwalk District Trails project?

It includes a trail system around a detention pond and an extension connecting existing trails to Kingsland Boulevard. The TDLR record lists 17,100 square feet and an applicant-estimated cost of $2 million.

When was the Boardwalk District Trails project registered?

The TDLR registration was filed December 27, 2024. Its project number is TABS2025008523.

Is the Boardwalk District Trails project still active?

The TDLR record lists the project status as closed. The registration was filed on December 27, 2024.

What is being built near Arena Group on Southwest Freeway?

The project listed at 7322 Southwest Freeway is Phase 3 Boardwalk District Trails. Its scope describes a 12-foot-wide trail around a detention pond and an extension to Kingsland Boulevard.

Also being built nearby

All of 77040
Get alerts for 7322 Southwest Fwy