11000 Chatterton Dr
Houston, TX 77043 · Spring Branch Trail
Spring Branch Trail Phase 4A proposed in Houston
A proposed Spring Branch Trail Phase 4A project at 11000 Chatterton Dr includes about 67,000 square feet of concrete pavement. The TDLR registration was filed March 10, 2026, and lists an applicant-estimated project cost of $2.32 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 10, 2026
- since Mar 10, 2026
- Largest scope
- 67,000 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
Under constructionSpring Branch Trail-Phase 4A (SB04A)
67,000 sq ft · $2.3M est.
- RegisteredMar 10, 2026
- Plan review
- ConstructionJun '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProposed trail with approx 67,000sf of concrete pavement — spring branch trail
TDLR project registrationNew ConstructionReview Complete67,000 sq ft$2.3M est.- Project #
- TABS2026014644
- Tenant / owner
- Spring Branch Trail-Phase 4a (sb04a)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11000 Chatterton Dr
What is being built at 11000 Chatterton Dr in Houston?
A TDLR registration describes the project as a proposed section of the Spring Branch Trail, Phase 4A, with about 67,000 square feet of concrete pavement.
When was the Spring Branch Trail Phase 4A project filed?
The TDLR registration, TABS2026014644, was filed March 10, 2026. Its status is listed as Review Complete.
How much will the Spring Branch Trail project cost?
The applicant’s estimated cost for the project is $2.32 million, according to the TDLR registration filed March 10, 2026.
How much concrete pavement is planned for Spring Branch Trail Phase 4A?
The registration describes about 67,000 square feet of concrete pavement for the proposed trail project.
What is being built near Brownwood Capital Investments in Houston?
A proposed Spring Branch Trail Phase 4A project is listed at 11000 Chatterton Dr, about 144 meters from Brownwood Capital Investments at 1818 Wycliffe Dr. The TDLR registration was filed March 10, 2026.
Also being built nearby
All of 77043- 1801 Wycliffe DrOct 15, 2024Minor residential repairs, single family residential · 32 m away
- 1721 Wycliffe DrJul 12, 2024Demolition res/sewer disc · 65 m away
- 1902 Lizards LnAug 20, 2021Single-family residence with attached garage · 105 m away
- 1908 Easy Wind LnNov 2, 2020Single-family residence with attached garage · 127 m away
- 11016 Avenu Malkenu AveAug 16, 2018Single-family residence with attached garage · 131 m away
- 1906 Easy Wind LnNov 2, 2020Single-family residence with attached garage · 134 m away
- 1904 Easy Wind LnJun 29, 2021Single-family residence with attached garage · 141 m away
- 11028 Avenu Malkenu AveApr 11, 2019Single-family residence with attached garage · 142 m away
- 1911 Lizards LnNov 21, 2019(epr) new residential solar panels · 142 m away
- 1818 Wycliffe Dr · Brownwood Capital Investments LLCMay 10, 2026Single-family residence. with attached garage / (mst of 2) · 144 m away
- 1902 Easy Wind LnAug 9, 2021Single-family residence with attached garage · 147 m away
- 1905 Easy Wind LnNov 2, 2020S.f. residence with attached garage · 149 m away