13460 Lockwood Rd
Houston, TX 77044 · Materials And Molding R&d, Technip Fmc - Subsea Lane Entrance
Houston site gets lab buildout and campus entrance work
TDLR records show a lab interior buildout in an existing industrial building and a new entrance addition to a corporate campus at 13460 Lockwood Rd. The projects were registered on Jan. 30, 2026, and Jan. 16, 2026, respectively, as work at a multi-tenant site.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 30, 2026
- since Jan 16, 2026
- Largest scope
- 3,175 sf
- Estimated cost
- $2.6M
- state registration
Where this project stands
Finishing up · inspection nextMATERIALS AND MOLDING R&D
3,175 sq ft · $2.6M est.
- RegisteredJan 30, 2026
- Plan review
- ConstructionFeb '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsA 3,175 gsf package for interior modifications at an existing industrial building for a new lab interior buildout and open equipment area. new lab interior buildout to have mezzanine access for infrastructure equipment access. current construction do — building s07
TDLR project registrationRenovation/AlterationReview Complete3,175 sq ft$2.6M est.- Project #
- TABS2026011276
- Tenant / owner
- Materials And Molding R&d
- Design firm
- Pro
- Contact
- Pro
A new construction addition to a corporate campus, including a five-lane driveway with a subsea lane curb cut and electronic access control. the scope covers a 200 sq ft guard booth, shade canopy, site lighting, signage, and landscaping. — technip fmc campus
TDLR project registrationNew ConstructionReview Complete200 sq ft$1.9M est.- Project #
- TABS2026010314
- Tenant / owner
- Technip Fmc - Subsea Lane Entrance
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13460 Lockwood Rd
What is being built at 13460 Lockwood Rd?
TDLR records describe a new lab interior buildout with an open equipment area at an existing industrial building, plus a new five-lane campus entrance with a guard booth and access controls.
When were the projects at 13460 Lockwood Rd registered?
The Technip FMC - Subsea Lane Entrance registration, TABS2026010314, is dated Jan. 16, 2026. The Materials and Molding R&D registration, TABS2026011276, is dated Jan. 30, 2026.
What's being built near Technip FMC Racking on Lockwood Drive?
TDLR records list a lab interior buildout at the multi-tenant site, including an open equipment area and mezzanine access for infrastructure equipment. The registration is dated Jan. 30, 2026.
What does the Technip FMC entrance project include?
The registered project includes a five-lane driveway, a subsea lane curb cut, electronic access control, a 200-square-foot guard booth, a shade canopy, lighting, signage, and landscaping. It was registered Jan. 16, 2026.
Is this a new building at 13460 Lockwood Rd?
The lab project is described as interior modifications to an existing industrial building. The separate Technip FMC project is a new construction addition to a corporate campus.
How large is the lab buildout at 13460 Lockwood Rd?
The Materials and Molding R&D registration describes a 3,175-gross-square-foot interior project. Its TDLR record, TABS2026011276, is dated Jan. 30, 2026.
Also being built nearby
All of 77044- 13460 Lockwood Drive · Ftitx001 LLCNov 5, 2026Technip fmc racking — renovation/alteration — installation of storage racks in existing warehouse
- 13455 Lockwood Rd · General Services BuildingMar 25, 2024General services building - generation park campus — new construction — first floor will be occupied for instructional use, group b occupancy. 2nd floor is structural only and will remain unoccupied and inaccessible until plans are approved for subsequent phase development · 261 m away