12100 Hiram Clarke Rd

Houston, TX 77045 · Callisto I Energy Center LLC, Callisto II Energy Center

Battery storage facility and utility equipment work in Houston

Records describe a multi-tenant energy site at 12100 Hiram Clarke Road, including utility equipment pads and a registered 300-megawatt, two-hour battery energy storage facility with a substation. The City of Houston issued permits for substation foundation pads on March 12, 2026, and utility power equipment pads on May 6, 2026. The applicant estimated the battery project at $57.5 million.

Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated May 6, 2026

Projects
4
10 filings
Latest filing
May 6, 2026
since Jul 11, 2023
Largest scope
—
Estimated cost
$58M
state registration

Where this project stands

Construction underway

Utility power equipment pads install

  1. Building permitMay 6, 2026
  2. Trade permitsDec 26, 2025
  3. Occupancy

Plumbing, electrical or fire permits are filed, so trades are on site or about to be.

The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.

2 contacts on this project · 1 phone number

Permit & project history

4 projects
  1. Utility power equipment pads install

    City of Houston permitFire alarmBuildingFire — sprinkler
    Project
    25120249
    Tenant / owner
    Callisto I Energy Center LLC
    Contractor
    Pro
    Contact
    Pro

    UTILITY POWER EQUIPMENT PADS INSTALL 2021 IBC

  2. Substation foundation pads with sitework

    City of Houston permitBuilding — alterationFire — sprinklerBuilding
    Project
    25095680
    Tenant / owner
    Callisto I Energy Center LLC
    Contractor
    Pro
    Contact
    Pro

    SUBSTATION FOUNDATION PADS W/SITEWORK 2021 IBC

  3. Construction of 300mw 2-hour battery energy storage facility and substation to interconnect to utility grid. scope includes private access road, civil/drainage, foundations, and water line for fire protection system. — callisto ii energy center

    TDLR project registrationNew ConstructionProject Registered550,000 sq ft$58M est.
    Tenant / owner
    Callisto II Energy Center
    Design firm
    Pro
    Contact
    Pro
  4. New foundation pad for utility equipm't

    City of Houston permitBuilding
    Project
    23012713
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    NEW FOUNDATION PAD FOR UTILITY EQUIPM'T '15IBC

Sources: City of Houston · Texas Department of Licensing and Regulation

Questions about 12100 Hiram Clarke Rd

What is being built at 12100 Hiram Clarke Road?

Records describe utility equipment pads and a 300-megawatt, two-hour battery energy storage facility with a substation. The site is listed as multi-tenant.

When were permits filed for the work at 12100 Hiram Clarke Road?

Houston permit 25095680 for substation foundation pads and sitework is dated March 12, 2026. Permit 25120249 for utility power equipment pads is dated May 6, 2026.

How large is the Callisto II battery storage project?

The TDLR registration describes a 300-megawatt, two-hour battery energy storage facility and lists 550,000 square feet. The registration, TABS2026004170, is dated October 24, 2025.

How much is the Callisto II project estimated to cost?

The applicant's estimate for the project is $57.5 million, according to TDLR registration TABS2026004170.

What's being built near Callisto II Energy Center on Hiram Clarke Road?

At 12100 Hiram Clarke Road, records show utility equipment pads and substation foundation work, alongside registration of a battery energy storage facility. Callisto II Energy Center is listed nearby at 12302 Hiram Clarke Road.

Does the battery project include a substation?

Yes. The TDLR description includes a substation to connect the facility to the utility grid. It also lists a private access road, drainage and civil work, foundations, and a fire-protection water line.