Battery storage facility and utility equipment work in Houston
Records describe a multi-tenant energy site at 12100 Hiram Clarke Road, including utility equipment pads and a registered 300-megawatt, two-hour battery energy storage facility with a substation. The City of Houston issued permits for substation foundation pads on March 12, 2026, and utility power equipment pads on May 6, 2026. The applicant estimated the battery project at $57.5 million.
Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated May 6, 2026
- Projects
- 4
- 10 filings
- Latest filing
- May 6, 2026
- since Jul 11, 2023
- Largest scope
- —
- Estimated cost
- $58M
- state registration
Where this project stands
Construction underwayUtility power equipment pads install
- Building permitMay 6, 2026
- Trade permitsDec 26, 2025
- Occupancy
Plumbing, electrical or fire permits are filed, so trades are on site or about to be.
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
4 projectsConstruction of 300mw 2-hour battery energy storage facility and substation to interconnect to utility grid. scope includes private access road, civil/drainage, foundations, and water line for fire protection system. — callisto ii energy center
TDLR project registrationNew ConstructionProject Registered550,000 sq ft$58M est.- Project #
- TABS2026004170
- Tenant / owner
- Callisto II Energy Center
- Design firm
- Pro
- Contact
- Pro
Sources: City of Houston · Texas Department of Licensing and Regulation
Questions about 12100 Hiram Clarke Rd
What is being built at 12100 Hiram Clarke Road?
Records describe utility equipment pads and a 300-megawatt, two-hour battery energy storage facility with a substation. The site is listed as multi-tenant.
When were permits filed for the work at 12100 Hiram Clarke Road?
Houston permit 25095680 for substation foundation pads and sitework is dated March 12, 2026. Permit 25120249 for utility power equipment pads is dated May 6, 2026.
How large is the Callisto II battery storage project?
The TDLR registration describes a 300-megawatt, two-hour battery energy storage facility and lists 550,000 square feet. The registration, TABS2026004170, is dated October 24, 2025.
How much is the Callisto II project estimated to cost?
The applicant's estimate for the project is $57.5 million, according to TDLR registration TABS2026004170.
What's being built near Callisto II Energy Center on Hiram Clarke Road?
At 12100 Hiram Clarke Road, records show utility equipment pads and substation foundation work, alongside registration of a battery energy storage facility. Callisto II Energy Center is listed nearby at 12302 Hiram Clarke Road.
Does the battery project include a substation?
Yes. The TDLR description includes a substation to connect the facility to the utility grid. It also lists a private access road, drainage and civil work, foundations, and a fire-protection water line.
Also being built nearby
All of 77045- 12100 Hiram Clarke Rd Rie 1Aug 16, 2024New 540 sq ft instrument control room building
- 12302 Hiram Clarke Rd · Callisto II Energy Center Llc.Apr 30, 2026Battery energy storage system foundation only · 388 m away
- 12584 Hiram Clarke RdJul 7, 2020Power generating station · 394 m away
- 12607 Paso Del Flores DrJan 5, 2021Residential patio and outdoor kitchen addition · 410 m away
- 12111 Main St Cpt 5Dec 3, 2020972sf/ new carport for apts (20/23) · 416 m away
- 12111 Main St Bld10Dec 3, 202027,512sf/new apartment building / (12/23) · 416 m away
- 12111 Main St Bld11Dec 3, 202027,512sf/new apartment building / (13/23) · 416 m away
- 12111 Main St Bld12Dec 3, 202027,512sf/new apartment building / (14/23) · 416 m away
- 12111 Main St Bld14Dec 3, 202024048sf new apartment building/ / (m/23) · 416 m away
- 12111 Main St Cpt 3Dec 3, 2020972sf/ new carport for apts (18/23) · 416 m away
- 12111 Main St Cpt 2Dec 3, 2020972sf/ new carport for apts (17/23) · 416 m away
- 12111 Main St Cpt 6Dec 3, 20201,062sf/ new carport for apts (21/23) · 416 m away