13000 Nitida St
Houston, TX 77045 · City Of Houston
Drainage and park improvements planned for Cambridge Park
A City of Houston project at 13000 Nitida St calls for storm sewer construction, a detention pond and amenities at Cambridge Village Park. The project was registered with TDLR on April 11, 2024; the applicant estimates its cost at $6.6 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 11, 2024
- since Apr 11, 2024
- Largest scope
- 1 sf
- Estimated cost
- $6.6M
- state registration
Where this project stands
Finishing up · inspection nextCambridge Park Village Park Drainage Improvments
1 sq ft · $6.6M est.
- RegisteredApr 11, 2024
- Plan review
- ConstructionAug '24 – Dec '25
- Inspectednow
- Closed
Scheduled to finish Dec 31, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction of 7'x4' rcb storm sewer, detention pond, and park amenities (including 8' concrete trail (77,700 sq ft), landscape plantings, pedestrian lighting, playground equipment (3,000 sq ft), soccer field, and irrigation systems.) — cambridge village park
TDLR project registrationNew ConstructionReview Complete1 sq ft$6.6M est.- Project #
- TABS2024015951
- Tenant / owner
- Cambridge Park Village Park Drainage Improvments
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13000 Nitida St
What is being built at 13000 Nitida St?
The Cambridge Park Village Park project includes a storm sewer, detention pond and park amenities. The project was registered with TDLR on April 11, 2024.
What amenities are planned for Cambridge Village Park?
The registration lists an 8-foot concrete trail, landscape plantings, pedestrian lighting, playground equipment, a soccer field and irrigation systems.
How much will the Cambridge Village Park project cost?
The applicant's estimated cost for the project is $6.6 million.
When was the Cambridge Park project registered?
The project was registered with the Texas Department of Licensing and Regulation on April 11, 2024.
What is being built near 38 Heights Estate Group on Allum Road?
About 164 meters from 38 Heights Estate Group, the Cambridge Village Park project at 13000 Nitida St includes drainage work and park amenities.
Also being built nearby
All of 77045- 5030 Allum Rd · 38 Heights Estate Group LLCJun 18, 2025Demolition res/sewer disc · 164 m away
- 5115 Allum RdJul 27, 2026Residential foundation repair (46 exterior piles) · 198 m away
- 13101 Nitida St Cnpy3Aug 12, 2026(3/3) park open-air canopy install · 244 m away
- 13101 Nitida St Cnpy1Aug 12, 2026(m/3) park open-air canopy install · 244 m away
- 13101 Nitida St Cnpy2Aug 12, 2026(2/3) park open-air canopy install · 244 m away
- 13099 Rosecrest Dr · Ejab LLCMay 8, 2026Jacks breakroom solutions — new construction — new pre-engineered steel building with two bays commercial use fitout and site development including parking sufficient for full fitout and stormwater detention · 266 m away
- 5205 Allum RdJun 3, 202147000.sq ft walk-up apartment building, s/a · 282 m away
- 5148 Lotus DrJan 8, 2020Occ report/fabrication shop/10,000 sq ft/70 code with flame · 319 m away
- 5143 Canyon Blanco DrSep 18, 2018New residential back patio cover · 398 m away
- 4920 Allum RdMar 24, 2017(epr) new 2400 sq ft auto shop · 401 m away
- 13216 Nitida StMay 8, 2017Residential repair per spec list · 411 m away
- 5007 Canyon Blanco DrJun 30, 2022Residential new roof-mounted solar panels · 412 m away