13888 S Post Oak Rd
Houston, TX 77045 · Cwp Asset Corp
Mister Car Wash plans 4,889-square-foot Houston tunnel wash
A new 4,889-square-foot Mister Car Wash tunnel wash is planned at 13888 S. Post Oak Rd. A Texas Department of Licensing and Regulation project registration was filed March 12, 2026; it lists the project as new construction and shows a status of Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 12, 2026
- since Jul 15, 2024
- Largest scope
- 5,402 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
Under constructionMister Car Wash
4,889 sq ft · $2.0M est.
- RegisteredMar 12, 2026
- Plan review
- ConstructionSep '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsNew ground up tunnel car wash - 4,889 sq ft — mister car wash
TDLR project registrationNew ConstructionReview Complete4,889 sq ft$2.0M est.- Project #
- TABS2026014799
- Tenant / owner
- Mister Car Wash
- Design firm
- Pro
- Contact
- Pro
New ground up tunnel car wash — mister car wash
TDLR project registrationNew ConstructionProject Closed5,402 sq ft$2.0M est.- Project #
- TABS2024022996
- Tenant / owner
- Mister Car Wash
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13888 S Post Oak Rd
What is being built at 13888 S. Post Oak Rd in Houston?
A new 4,889-square-foot Mister Car Wash tunnel car wash is planned for the site. The TDLR project registration was filed March 12, 2026.
Is a Mister Car Wash coming to 13888 S. Post Oak Rd?
A TDLR registration lists a new ground-up tunnel car wash under the name Mister Car Wash. The registration was filed March 12, 2026, and its status is Review Complete.
How big will the car wash at 13888 S. Post Oak Rd be?
The project registration lists the tunnel car wash at 4,889 square feet.
How much is the Mister Car Wash project estimated to cost?
The TDLR registration lists an estimated project cost of $2 million. This is the applicant's estimate, not a confirmed final cost.
What's being built near Burger King on S. Post Oak Rd?
A new Mister Car Wash tunnel wash is planned at 13888 S. Post Oak Rd, about 258 meters from the Burger King at 13535 S. Post Oak Rd. The project registration was filed March 12, 2026.
Is the Mister Car Wash near Estrellas Bakery #3llc?
The planned car wash at 13888 S. Post Oak Rd is about 314 meters from Estrellas Bakery #3llc at 14023 S. Post Oak Rd.
Also being built nearby
All of 77045- 13880 S Post Oak RdApr 9, 20192,984 sq ft restaurant remodel 100% · 14 m away
- 13859 S Post Oak RdFeb 14, 2017New 7373 sq ft retail building with high pile 100%esfr · 62 m away
- 13825 S Post Oak RdOct 19, 20225,747 sq ft conv't gameroom to washateria · 126 m away
- 13815 S Post Oak Rd AtmJan 8, 2019New drive up atm · 128 m away
- 13925 S Post Oak RdAug 26, 2021Fire station roofing renovations · 159 m away
- 13818 Lockway DrMay 28, 2024New residential solar panels · 194 m away
- 5425 W Orem DrOct 9, 20172,720 sq ft night club remodel · 221 m away
- 13800 Lockway Dr · Tidal Property Management, Llc.Jan 6, 2026Apartment stair repairs · 226 m away
- 14020 S Post Oak RdJan 9, 2019Occ report/retail shop including 2302/ 2500sqft/70 code · 230 m away
- 5505 W Orem DrMay 16, 2019Commercial foundation repair permit (8 exterior piers) · 245 m away
- 5335 Ripplebrook DrJan 21, 2021280sf new patio cover on existing slab · 247 m away
- 13535 S Post Oak Rd · Burger KingMar 9, 20263,425 sq ft restaurant remodel · 258 m away