groundranger
Recent · latest filing Jun 2026Commercial

2525a Holly Hall

Houston, TX 77054 · Harris County Hospital District

Interior renovations for linear accelerator replacement

Interior renovations are planned for two existing linear accelerator vaults and their control rooms at 2525A Holly Hall. The TDLR project registration was filed June 10, 2026, and describes cosmetic upgrades to support a system upgrade to the linear accelerator equipment. The applicant estimates the project cost at $1,871,533.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 10, 2026

Projects
1
1 filings
Latest filing
Jun 10, 2026
since Jun 10, 2026
Largest scope
3,000 sf
Estimated cost
$1.9M
state registration

Where this project stands

Under construction

HHS SCP ACS SC Linear Accelerator Replacement

3,000 sq ft · $1.9M est.

  1. RegisteredJun 10, 2026
  2. Plan review
  3. ConstructionOct '26 – Apr '28
  4. Inspected
  5. Closed
8% through of a 19-month buildOct 1, 2026 → Apr 30, 2028

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Level 1 existing linac vault #1 & #2 and corresponding control rooms: interior renovation work and cosmetic upgrades to support a system upgrade to linac equipment. — harris health

    TDLR project registrationRenovation/AlterationReview Complete3,000 sq ft$1.9M est.
    Tenant / owner
    Hhs Scp Acs Sc Linear Accelerator Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2525a Holly Hall

What is being built at 2525A Holly Hall?

The project involves interior renovations and cosmetic upgrades to two existing linear accelerator vaults and their corresponding control rooms. The work is intended to support a linear accelerator equipment system upgrade.

When was the 2525A Holly Hall project filed?

The TDLR registration was filed June 10, 2026. It is listed as review complete.

What is the project number for the work at 2525A Holly Hall?

The TDLR project number is TABS2026022546. The registration is dated June 10, 2026.

How much will the Holly Hall renovation cost?

The applicant estimates the project cost at $1,871,533. This is the estimate listed in the TDLR registration.

How large is the 2525A Holly Hall project?

The TDLR registration lists 3,000 square feet for the renovation and alteration work.

Email me when it passes inspection