2626 South Loop West 260
Houston, TX 77054
2626 South Loop West 260: 2 projects on record
City of Houston lists 2 filings across 2 projects at 2626 South Loop West 260, Houston, TX 77054 since August 16, 2017. The most recent, filed September 15, 2017, covers: “Office remodel”.
Compiled from City of Houston records · updated Sep 15, 2017
- Projects
- 2
- 2 filings
- Latest filing
- Sep 15, 2017
- since Aug 16, 2017
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2017 · no recent filingsOffice remodel
- Building permitSep 15, 2017
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
2 projectsSources: City of Houston
Questions about 2626 South Loop West 260
What is being built at 2626 South Loop West 260?
The latest filing (City of Houston permit 17100579, September 15, 2017) covers office remodel.
How many permits and filings does 2626 South Loop West 260 have?
2 filings across 2 projects, from August 16, 2017 to September 15, 2017.
What is being built near Amalgamated Houston Holdings in Houston?
2626 South Loop West 260 is about 1 m from Amalgamated Houston Holdings (2616 South Loop West). Its latest filing is for office remodel.
Is there other construction near 2626 South Loop West 260?
Yes. Nearby filings include 2626 South Loop West (office foundation repair, Mar 7, 2017); 2616 South Loop West (chcp med center level 3 — renovation/alteration — renovation of office into space for trade school for medical professions. note students are above grade 12, Feb 27, 2024); 2656 South Loop West 574 (office remodel 2012 fire alarm, Feb 15, 2017).
How do I get alerts for new permits at 2626 South Loop West 260?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77054- 2626 South Loop WestMar 7, 2017Office foundation repair
- 2616 South Loop West · Amalgamated Houston Holdings LLCFeb 27, 2024Chcp med center level 3 — renovation/alteration — renovation of office into space for trade school for medical professions. note students are above grade 12 · 1 m away
- 2656 South Loop West 574Feb 15, 2017Office remodel 2012 fire alarm · 3 m away
- 2656 South Loop West 650Jun 18, 2018Office remodel · 3 m away
- 2600 South Loop West 330Jul 20, 2018Office remodel (6 of 8) · 27 m away
- 2600 South Loop West 326Jul 20, 2018Office remodel (4 of 8) · 27 m away
- 2600 South Loop West 334Jul 20, 2018Office remodel (8 of 8) · 27 m away
- 2600 South Loop West 324Jul 20, 2018Office remodel (3 of 8) · 27 m away
- 2600 South Loop West 320Jul 20, 2018Office remodel (master of 8) · 27 m away
- 2600 South Loop West 328Jul 20, 2018Office remodel (5 of 8) · 27 m away
- 2600 South Loop West 322Jul 20, 2018Office remodel (2 of 8) · 27 m away
- 2600 South Loop West 332Jul 20, 2018Office remodel (7 of 8) · 27 m away