groundranger
Historic · latest filing Mar 2019Residential

7953 Cedel Dr

Houston, TX 77055

7953 Cedel Dr: 1 project on record

City of Houston lists 1 filing across 1 project at 7953 Cedel Dr, Houston, TX 77055. The most recent, filed March 27, 2019, covers: “Residential remodel/repair per spec list”.

Compiled from City of Houston records · updated Mar 27, 2019

Projects
1
1 filings
Latest filing
Mar 27, 2019
since Mar 27, 2019
Largest scope
—
Listed value
—

Where this project stands

Permitted 2019 · no recent filings

Residential remodel/repair per spec list

  1. Building permitMar 27, 2019
  2. Trade permits
  3. Occupancy

The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.

Permit & project history

1 project
  1. Residential remodel/repair per spec list

    City of Houston permitBuilding
    Project
    19036039
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    RESIDENTIAL REMODEL/REPAIR PER SPEC LIST 2012 IRC

Sources: City of Houston

Questions about 7953 Cedel Dr

What is being built at 7953 Cedel Dr?

The latest filing (City of Houston permit 19036039, March 27, 2019) covers residential remodel/repair per spec list.

How many permits and filings does 7953 Cedel Dr have?

1 filing across 1 project, from March 27, 2019 to March 27, 2019.

What is being built near Brimstone Properties 1 in Houston?

7953 Cedel Dr is about 63 m from Brimstone Properties 1 (7938 Turquoise Ln). Its latest filing is for residential remodel/repair per spec list.

Is there other construction near 7953 Cedel Dr?

Yes. Nearby filings include 7954 Cedel Dr (residential interior remodel/repair, Feb 19, 2019); 7945 Cedel Dr (residential repairs per spec list, Aug 14, 2019); 7961 Cedel Dr ((epr) new residential solar panels, Jun 7, 2019).

How do I get alerts for new permits at 7953 Cedel Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 77055
Email me when a new permit is filed