1080 Uptown Park Blvd
Houston, TX 77056
Hotel remodel and interior demolition at 1080 Uptown Park Blvd
City of Houston permits indicate a hotel remodel at 1080 Uptown Park Blvd, including work described as a 27,250-square-foot partial Level 1 remodel. The filings also cover interior demolition and equipment pads. Permits were filed from July 22 to November 2, 2024.
Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated Nov 2, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Nov 2, 2024
- since Jul 22, 2024
- Largest scope
- 27,250 sf
- Estimated cost
- $4.6M
- state registration
Where this project stands
Permitted 2024 · no recent filingsHotel remodel with equipm't pads
- Building permitNov 2, 2024
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
4 projectsRenovation of the interior of the existing level 1 partial renovation of hotel amenities in a 6 story hotel. the partial renovation will include upgrades to the lobby and lounge areas, restaurant, bar, kitchen, conference center, fitness, and corrds. — hotel granduca
TDLR project registrationRenovation/AlterationInspection Complete27,000 sq ft$4.6M est.- Project #
- TABS2024022266
- Tenant / owner
- Hotel Granduca Renovation - Interiors
- Design firm
- Pro
- Contact
- Pro
Sources: City of Houston · Texas Department of Licensing and Regulation
Questions about 1080 Uptown Park Blvd
What is being built at 1080 Uptown Park Blvd?
City of Houston permits indicate a hotel remodel, including a 27,250-square-foot partial Level 1 remodel. The filings also include interior demolition and equipment pads.
When were permits filed for the hotel remodel at 1080 Uptown Park Blvd?
The three City of Houston permits were filed between July 22 and November 2, 2024. They include permits 24063838, 24068632 and 24094787.
What does the 27,250-square-foot permit cover at 1080 Uptown Park Blvd?
Permit 24068632, filed September 13, 2024, describes a 27,250-square-foot partial Level 1 hotel remodel.
Is there interior demolition at 1080 Uptown Park Blvd?
Yes. Permit 24063838, filed July 22, 2024, covers demolition of interior non-load-bearing, non-fire-rated walls.
What's being remodeled near Joe & The Juice on Uptown Park Blvd?
A hotel remodel is permitted at 1080 Uptown Park Blvd. The Joe & The Juice listing is at 1101 Uptown Park Blvd; the records do not state that it is part of the hotel project.
Are equipment pads included in the hotel work at 1080 Uptown Park Blvd?
A City of Houston permit filed November 2, 2024, describes a hotel remodel with equipment pads. The permit is numbered 24094787.
Also being built nearby
All of 77056- 1121 Uptown Park Blvd · Uptown ParkJul 30, 2024Boardroom — renovation/alteration — convert retail to men's salon · 109 m away
- 1111 Uptown Park BlvdJan 5, 20233,483 sq ft auto showrm conversn · 116 m away
- 1100 Uptown Park BlvdAug 27, 20245,532 sq ft high rise condo remodel · 127 m away
- 1000 Uptown Park Blvd · Shelton Robert AndrewsJun 17, 2026Hi-rise condo remodel · 131 m away
- 1101 Uptown Park Blvd C-7Jun 8, 2022240 sq ft (steel container) retail building · 160 m away
- 1101 Uptown Park Blvd · Joe & The Juice Inc.Sep 17, 20261,476 sq ft convert to juice bar 100% · 160 m away
- 4720 Post Oak Timber DrFeb 27, 2018Townhome remodel & flood repair · 163 m away
- 4714 Post Oak Timber DrMar 27, 2018New residential brick wall · 164 m away
- 4722 Post Oak Timber DrNov 29, 2017Residential repair per spec list · 164 m away
- 4724 Post Oak Timber DrMar 1, 2018Harvey townhome storm damage repair per checklist · 166 m away
- 1121 Uptown Park BlvdNov 6, 20241,751 retail to salon · 174 m away
- 4738 Post Oak Timber DrJul 25, 2018Harvey storm damage repair per spec list · 181 m away