5000 Westheimer Road Lod Space 15
Houston, TX 77056 · Kimco Realty Op, LLC
Eataly interior renovation planned at Centre at Post Oak
A 20,050-square-foot interior renovation of an existing retail space is planned for Eataly at Centre at Post Oak, combining restaurants, specialty marketplaces, cafes, bars and grab-and-go food counters. The TDLR project registration was filed October 24, 2025, and lists an applicant-estimated project cost of $11.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 24, 2025
- since Oct 24, 2025
- Largest scope
- 20,050 sf
- Estimated cost
- $12M
- state registration
Where this project stands
Finishing up · inspection nextEATALY
20,050 sq ft · $12M est.
- RegisteredOct 24, 2025
- Plan review
- ConstructionJan '26 – Sep '26
- Inspectednow
- Closed
Scheduled to finish Sep 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectThe project will include the full interior renovation of an existing retail space creating a hybrid space that combines a mix of restaurants, specialty marketplaces, cafes, bars and grab and go food counters. — centre at post oak
TDLR project registrationRenovation/AlterationReview Complete20,050 sq ft$12M est.- Project #
- TABS2026004229
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5000 Westheimer Road Lod Space 15
What is being built at 5000 Westheimer Road in Houston?
A TDLR registration describes a 20,050-square-foot interior renovation of an existing retail space for Eataly. The planned space would combine restaurants, specialty marketplaces, cafes, bars and grab-and-go food counters.
Is Eataly opening at Centre at Post Oak?
A TDLR project registration names Eataly and describes an interior renovation at Centre at Post Oak. It was filed October 24, 2025, under project number TABS2026004229.
What will the Eataly renovation include?
The registration describes a hybrid space with restaurants, specialty marketplaces, cafes, bars and grab-and-go food counters. The project covers 20,050 square feet.
How much is the Eataly project at 5000 Westheimer estimated to cost?
The TDLR registration lists an applicant-estimated cost of $11.5 million for the project.
What's being renovated near Miu Miu Houston Galleria on Westheimer?
A TDLR registration describes an Eataly interior renovation at 5000 Westheimer Road, about 33 meters from the listed Miu Miu Houston Galleria landmark. The registration was filed October 24, 2025.
When was the Eataly project at Centre at Post Oak filed?
The TDLR registration was filed October 24, 2025. Its project number is TABS2026004229.
Also being built nearby
All of 77056- 5000 Westheimer Rd Houston TX 77056 · Kimco Realty CorporationSep 8, 2025The centre at post oak — renovation/alteration — remodel of existing retail center
- 5000 Westheimer RoadMar 18, 2025Pvolve — renovation/alteration — fitness studio-tenant improvement of an existing tenant space. work to include non-bearing interior partitions, accessible restrooms, millwork, plumbing, mechanical, and electrical
- 5011 Westheimer · Ia Lodging Houston Oaks LPJan 29, 2024Westin oak restaurant & bar — renovation/alteration — renovation of the existing 2,986 sq ft restaurant to include new entrance doors, bar and behind bar floor tile, restaurant tables, chairs, banquettes, wall covering and painted ceilings · 30 m away
- 5015 Westheimer Road, Space A3422 · Simon Property GroupJan 7, 2025Balmain houston galleria — renovation/alteration — retail (use group m) tenant improvement work in newly demised grey shell lease area of the galleria i · 33 m away
- 5015 Westheimer Road - Space · Hg Galleria, LLCNov 3, 2026Miu miu houston galleria — renovation/alteration — tenant improvement work of existing demised lease premises to totaling approximately 4,513 sq ft space. tiw scope to include new storefront, finishes, casework, stock and service areas, and mep/fls improvements to support the retail program · 33 m away
- 5015 Westheimr Road Space 2120 · Simon Property GroupNov 25, 2024Fendi houston galleria — renovation/alteration — tenant improvement · 33 m away
- 5015 Westheimer Road Space A-3419 · Hg Galleria, LLCOct 10, 2025Elisabetta franchi — renovation/alteration — scope of work includes storefront system, drywall, millwork, carpentry, flooring, electrical, hvac, modification of existing sprinkler system and plumbing. square footage 2,168 · 33 m away
- 5015 Westheimer Road · Hg Galleria, LLCOct 31, 2025Prada main store — renovation/alteration — retail tenant fit-out. minor demolition, new partitions, finishes, fixtures, lighting, electrical, hvac; 5,975 sq ft · 33 m away
- 5015 Westheimer Rd Space A2265 · Hg Galleria LLCFeb 5, 2025Christian louboutin — renovation/alteration — renovation to sales area and storefront. new partitions, fixtures, and finishes. boh to remain as existing. including the restroom. new mechanical and electrical · 33 m away
- 5015 Westheimer Road Space A1441 · Hg Galleria I II III LPFeb 26, 2025Foot locker — renovation/alteration — total sq ft: 6,591 modified sq ft: 3,829 minor remodel of sales & fitting rm: demolition of 1 wall, new fixtures, lighting, finishes. new electrical at (5) new service points, new storefront signage and metal finishes. toilet rm light replacement · 33 m away
- 5015 Westheimer · Simon Property GroupJul 1, 2025Dior boh expansion houston galleria — renovation/alteration — the scope includes interior renovation of existing retail space. trades include mechanical, electrical & plumbing. new & existing sprinkler heads & branch distribution. existing mechanical units with new registers. existing ada toilet. new storefront · 33 m away
- 5015 Westheimer Road Galleria 1 No. A2323 · Hg Galleria I II III LPJan 14, 2025Golden goose - the galleria — renovation/alteration — interior tenant remodel, no change of use · 33 m away