groundranger
Historic · latest filing Mar 2025Commercial

5061 Westheimer Road

Houston, TX 77056 · Entry Modifications - Gv, Tile Replacement - Gv + 1 more

Galleria entry, tile and interior upgrades filed in 2024–2025

TDLR registrations at 5061 Westheimer Road describe upgrades to a Galleria mall entry and site, tile replacement, and an interior remodel. The filings date from July 2, 2024, through March 14, 2025, and cover work at a multi-tenant site.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 14, 2025

Projects
3
3 filings
Latest filing
Mar 14, 2025
since Jul 2, 2024
Largest scope
77,000 sf
Estimated cost
$2.0M
state registration

Where this project stands

Inspected · closing out

Entry Modifications - GV

77,000 sq ft · $700K est.

  1. RegisteredMar 14, 2025
  2. Plan review
  3. ConstructionMay '25 – Nov '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

3 projects
  1. Upgrades/enhancements to the del friscos mall entry and site work. work to include new site lighting, paint, new wall finishes, new building lighting, and new finish on existing concrete pavement. — the galleria (a simon mall)

    TDLR project registrationRenovation/AlterationInspection Complete77,000 sq ft$700K est.
    Tenant / owner
    Entry Modifications - Gv
    Design firm
    Pro
    Contact
    Pro
  2. Tile Replacement - GV

    Consists of tile demolition and tile refresh on first and second level of gv. — the galleria (a simon mall)

    TDLR project registrationRenovation/AlterationInspection Complete41,100 sq ft$2.0M est.
    Tenant / owner
    Tile Replacement - Gv
    Design firm
    Pro
    Contact
    Pro
  3. 10,492 square foot interior remodel of an existing space including meps. — camp - the galleria

    TDLR project registrationRenovation/AlterationProject Closed10,492 sq ft$2.0M est.
    Tenant / owner
    Camp - The Galleria
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5061 Westheimer Road

What is being built at 5061 Westheimer Road?

TDLR registrations describe renovations at the Galleria, including entry and site upgrades, tile replacement on the first and second levels, and an interior remodel. They do not describe a new standalone building.

What is changing near The Houston Galleria on Westheimer?

Registrations for 5061 Westheimer Road describe new site and building lighting, paint, wall finishes and a finish refresh for existing concrete pavement at a mall entry, along with tile replacement and an interior remodel.

When were the Galleria renovation projects filed?

The three TDLR registrations were filed July 2, 2024, August 1, 2024, and March 14, 2025. The latest is entry and site work, registration TABS2025014208.

Is a new store opening at 5061 Westheimer Road?

The records describe renovations, not a confirmed new store opening. One registration, filed July 2, 2024, is for a 10,492-square-foot interior remodel named CAMP - The Galleria.

What does the Galleria entry renovation include?

The March 14, 2025 registration lists site lighting, paint, new wall finishes, building lighting and a new finish on existing concrete pavement. It is TDLR project TABS2025014208.

Is tile being replaced at the Galleria?

Yes. A registration filed August 1, 2024, describes tile demolition and replacement on the first and second levels. The project is listed as TABS2024024478.

Also being built nearby

All of 77056

More demolitions in 77056.

Email me when the project is closed