groundranger
Recent · latest filing Mar 2026Commercial

777 Post Oak Blvd, Level 8

Houston, TX 77056 · Pob Holdings 777 LLC

Stone Ridge full-floor tenant build-out at 777 Post Oak

A full-floor tenant build-out for Stone Ridge is registered at 777 Post Oak Blvd, including an elevator lobby and core restrooms. The TDLR registration was filed March 20, 2026, and describes 18,140 square feet of second-generation space; the applicant estimates the project at $3.3 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 20, 2026

Projects
1
1 filings
Latest filing
Mar 20, 2026
since Mar 20, 2026
Largest scope
18,140 sf
Estimated cost
$3.3M
state registration

Where this project stands

Finishing up · inspection next

Stone Ridge

18,140 sq ft · $3.3M est.

  1. RegisteredMar 20, 2026
  2. Plan review
  3. ConstructionMay '26 – Sep '26
  4. Inspectednow
  5. Closed

Scheduled to finish Sep 1, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Stone Ridge

    Full floor tenant build-out of second generation space to include elevator lobby and core restrooms — 777 at the post oak

    TDLR project registrationRenovation/AlterationReview Complete18,140 sq ft$3.3M est.
    Tenant / owner
    Stone Ridge
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 777 Post Oak Blvd, Level 8

What is being built at 777 Post Oak Blvd?

A full-floor tenant build-out for Stone Ridge is registered for the address. The work includes an elevator lobby and core restrooms.

What is being built near Baker Katz at 777 Post Oak Blvd?

A TDLR registration describes a full-floor tenant build-out for Stone Ridge at 777 Post Oak Blvd. It was filed March 20, 2026.

How large is the Stone Ridge build-out?

The registration lists 18,140 square feet of second-generation space.

When was the 777 Post Oak project filed?

The TDLR project registration was filed March 20, 2026. Its project number is TABS2026015571.

How much is the 777 Post Oak build-out expected to cost?

The applicant's estimated cost for the project is $3.3 million.

Is this new construction at 777 Post Oak?

The registration describes a renovation and alteration of second-generation space, not a new building.

Also being built nearby

All of 77056
Email me when it passes inspection