777 Post Oak Blvd, Level 8
Houston, TX 77056 · Pob Holdings 777 LLC
Stone Ridge full-floor tenant build-out at 777 Post Oak
A full-floor tenant build-out for Stone Ridge is registered at 777 Post Oak Blvd, including an elevator lobby and core restrooms. The TDLR registration was filed March 20, 2026, and describes 18,140 square feet of second-generation space; the applicant estimates the project at $3.3 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 20, 2026
- since Mar 20, 2026
- Largest scope
- 18,140 sf
- Estimated cost
- $3.3M
- state registration
Where this project stands
Finishing up · inspection nextStone Ridge
18,140 sq ft · $3.3M est.
- RegisteredMar 20, 2026
- Plan review
- ConstructionMay '26 – Sep '26
- Inspectednow
- Closed
Scheduled to finish Sep 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectFull floor tenant build-out of second generation space to include elevator lobby and core restrooms — 777 at the post oak
TDLR project registrationRenovation/AlterationReview Complete18,140 sq ft$3.3M est.- Project #
- TABS2026015571
- Tenant / owner
- Stone Ridge
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 777 Post Oak Blvd, Level 8
What is being built at 777 Post Oak Blvd?
A full-floor tenant build-out for Stone Ridge is registered for the address. The work includes an elevator lobby and core restrooms.
What is being built near Baker Katz at 777 Post Oak Blvd?
A TDLR registration describes a full-floor tenant build-out for Stone Ridge at 777 Post Oak Blvd. It was filed March 20, 2026.
How large is the Stone Ridge build-out?
The registration lists 18,140 square feet of second-generation space.
When was the 777 Post Oak project filed?
The TDLR project registration was filed March 20, 2026. Its project number is TABS2026015571.
How much is the 777 Post Oak build-out expected to cost?
The applicant's estimated cost for the project is $3.3 million.
Is this new construction at 777 Post Oak?
The registration describes a renovation and alteration of second-generation space, not a new building.
Also being built nearby
All of 77056- 777 Post Oak Blvd · Pob Holdings 777, LLCAug 7, 2026Baker katz — renovation/alteration — second generation buildout of new tenant space
- 777 Post Oak Blvd Garag · Pob Holdings 777, LLCJul 6, 2026Cooling equipment replacement/relocation · 43 m away
- 777 Post Oak Blvd · Consulate General Of FranceOct 1, 20267,086 sq ft hi-rise office remodel 100% sp · 44 m away
- 755 Post Oak BlvdApr 11, 2024Demolition bld/sewer disc · 81 m away
- 1111 S Post Oak Ln Garag · Mhjv Tanglewood Property Owner LLCApr 27, 2026New 147,570sf parking garage(4/20) sp · 96 m away
- 1111 S Post Oak Ln Fp · Mhjv Tanglewood Property Owner LLCNov 17, 2025New 762sf fire pump room(3/20) sp · 96 m away
- 1111 S Post Oak Ln Fl19r · Mhjv Tanglewood Property Owner LLCNov 17, 2025New 13,483 sq ft apt outdr amenity (20 of 20) · 96 m away
- 1111 S Post Oak Ln · Mhjv Tanglewood Property Owner LLCMay 15, 2026New 30,930 sq ft apt bld floor (11 of 20) · 96 m away
- 1151 Uptown Park BlvdJun 17, 20211,467 sq ft restaurant expansion remodel 100% · 97 m away
- 1110 Post Oak BlvdMay 23, 2017New 8'-0" precast concrete fence · 172 m away
- 1200 Post Oak Blvd Cpt-5Jun 22, 20182,556 sq ft new parking garage carport (5 of 7) · 179 m away
- 1200 Post Oak Blvd Cpt-7Jun 22, 20181,134 sq ft new parking garage carport (7 of 7) · 179 m away