6529 Beverlyhill St
Houston, TX 77057 · Wisdom High School
Wisdom High School restroom remodel permitted in Houston
Permits indicate restroom remodeling at Wisdom High School, 6529 Beverlyhill St, including lockable doors. The City of Houston issued permit 26049754 for building and plumbing work on June 30, 2026. Earlier records include a 14,160-square-foot school remodel permitted in 2023.
Summarized from City of Houston records · updated Jun 30, 2026
- Projects
- 4
- 6 filings
- Latest filing
- Jun 30, 2026
- since Jun 30, 2017
- Largest scope
- 14,160 sf
- Listed value
- —
Where this project stands
Construction underwayRestroom remodel to add lockable doors sp/ 2021
- Building permitJun 30, 2026
- Trade permitsJun 10, 2026
- Occupancy
Plumbing, electrical or fire permits are filed, so trades are on site or about to be.
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
4 projectsSources: City of Houston
Questions about 6529 Beverlyhill St
What is being built at 6529 Beverlyhill St in Houston?
City permits indicate remodeling at Wisdom High School, including restroom work to add lockable doors. Permit 26049754 was issued June 30, 2026.
When was the Wisdom High School restroom remodel permitted?
The City of Houston permit is dated June 30, 2026. It covers building and plumbing work and is numbered 26049754.
How large is the school remodel at 6529 Beverlyhill St?
A separate 14,160-square-foot school remodel was permitted on June 7, 2023, under permit 22107749. The 2026 restroom permit does not list a square footage.
What is the standalone ERR C permit at Wisdom High School?
A City of Houston building and plumbing permit dated April 22, 2026, describes the work as “Standalone errc.” The permit record does not explain the abbreviation.
What school project is near A Sweet Factory on Hillcroft?
Wisdom High School at 6529 Beverlyhill St is about 236 meters from A Sweet Factory at 3330 Hillcroft Ave. Permits at the school include a restroom remodel dated June 30, 2026.
What is happening near 6415 Richmond Ave?
Wisdom High School at 6529 Beverlyhill St is about 244 meters away and has permits for school remodeling. Separately, a 14,177-square-foot new shell for future assembly was permitted at 6415 Richmond Ave in 2026.
Also being built nearby
All of 77057- 6529 Beverly Hill St Public Road Row · 6529 Beverly Hill StMar 10, 2025St. george place school crossings improvements — renovation/alteration — improving various street crossings by adding crosswalks, ada compliant ramps, phbs, rrfbs, sidewalk transitions and small road signs in the vicinity of wisdom high school · 180 m away
- 3330 Hillcroft StApr 13, 20171,750 sq ft office remodel · 203 m away
- 3330 Hillcroft Street · Telephone Road Holdings LLCJun 14, 2024Clutch city laundry — new construction — interior built-out of washeteria · 203 m away
- 6423 Richmond AveMay 27, 2022Addition to existing patio/ add sq ft for dining · 225 m away
- 3222 Hillcroft StFeb 23, 2018Demolition of interior non-load bearingng walls · 232 m away
- 3330 Hillcroft Ave A-1Oct 9, 20241,632 sq ft retail store remodel · 236 m away
- 3330 Hillcroft Ave B-1Oct 9, 20244,723 sq ft washateria buildout · 236 m away
- 3330 Hillcroft Ave · A Sweet FactoryJul 16, 2026Health review for occupancy rpt# 25120394 · 236 m away
- 3504 Hillcroft StFeb 15, 2019Retail facade repair · 241 m away
- 6415 Richmond Ave · 6415 Richmond RetailApr 7, 202614,177 sq ft new shell (fut. assembly) with stwk 21 · 244 m away
- 6419 Skyline Dr Bld12Mar 14, 2022Emergency habitability repairs sub bld 12 see master 19050328 · 244 m away
- 6419 Skyline Dr Bld11Mar 14, 2022Emergency habitability repairs sub bld 11 see master 19050328 · 244 m away