7300 Airport Blvd
Houston, TX 77061
Warehouse addition and upgrades at 7300 Airport Blvd
Houston permits show a 61,200-square-foot warehouse addition at 7300 Airport Blvd, permitted September 8, 2020, at an existing facility. Later permits cover high-pile storage racks and a warehouse paint booth, filed in 2021.
Summarized from City of Houston records · updated Jun 23, 2021
- Projects
- 4
- 4 filings
- Latest filing
- Jun 23, 2021
- since Jan 20, 2017
- Largest scope
- 68,757 sf
- Listed value
- —
Where this project stands
Permitted 2021 · no recent filingsWharehouse paint booth installation 100%
- Building permitJun 23, 2021
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
4 projectsSources: City of Houston
Questions about 7300 Airport Blvd
What is being built at 7300 Airport Blvd?
Houston permits indicate a warehouse addition and upgrades to an existing warehouse facility. The records include a 61,200-square-foot addition, high-pile storage racks and a paint booth.
When was the warehouse addition at 7300 Airport Blvd permitted?
The 61,200-square-foot warehouse addition was permitted on September 8, 2020, under City of Houston permit 20037299.
What are the recent permits for 7300 Airport Blvd?
Permits filed in 2021 cover a high-pile rack addition (permit 20112416, March 4) and a warehouse paint booth installation (permit 21024301, June 23).
How large is the warehouse addition at 7300 Airport Blvd?
A City of Houston permit filed September 8, 2020, describes a 61,200-square-foot warehouse addition. A separate 2017 permit describes a 68,757-square-foot high-pile addition to an existing warehouse.
What is being built near Dg Marine Transportation on Airport Blvd?
At 7300 Airport Blvd, about 307 meters from Dg Marine Transportation, Houston permits indicate warehouse additions and improvements. The records include a 61,200-square-foot addition permitted in 2020 and rack and paint booth work permitted in 2021.
What is being built near Powell Electrical Systems on Airport Blvd?
At 7300 Airport Blvd, about 410 meters from Powell Electrical Systems, permits describe work at an existing warehouse, including a 61,200-square-foot addition and later storage rack and paint booth work.
Also being built nearby
All of 77061- 7300 Airport Blvd FpSep 8, 2020New fire pump room (2/2)
- 7257 Airport BlvdMar 31, 2023Residential home repairs per spec list · 160 m away
- 8255 Tewantin DrJun 3, 2020(epr) 11,725 sq ft hi-pile whse remodel sp · 225 m away
- 7302 Fauna StJan 10, 2023835 sq ft residential addition · 248 m away
- 7320 Fauna StOct 1, 2018Residential repairs per spec list · 289 m away
- 7438 Airport Blvd · Dg Marine Transportation LLCSep 30, 2025Genesis airport building 2 renovation — renovation/alteration — nterior renovation of a single story, exisiting type iib building. scope includes selective demolition, and alteration that includes new partitions, ceilings, lights, finishes, millwork, mechanical, and electrical · 307 m away
- 7338 Fauna StDec 31, 2020Residential foundation repairs · 337 m away
- 7423 Airport BlvdJul 3, 2018Church repair per spec · 339 m away
- 7307 Fauna StJun 4, 2026New residential swimming pool/spa · 353 m away
- 7350 Fauna StFeb 22, 2022Sq ft residential remodel/addition · 376 m away
- 7180 Fauna StJul 19, 2023Residential addition and remodel & · 402 m away
- 7330 Neuhaus StFeb 24, 202321,200 sq ft new warehouse. 100% 4/7 · 404 m away