7333 Major Street
Houston, TX 77061 · Shasta Beverages, Inc.
Shasta Beverages refrigeration upgrades in Houston
A refrigeration-system upgrade is registered for Shasta Beverages’ existing building at 7333 Major Street in Houston. The Texas Department of Licensing and Regulation record was filed May 1, 2024, describes work in an area of up to 15,000 square feet, and lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated May 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 1, 2024
- since May 1, 2024
- Largest scope
- 15,000 sf
- Estimated cost
- $1.6M
- state registration
Where this project stands
CompletedShasta Soda Factory Upgrade
15,000 sq ft · $1.6M est.
- RegisteredMay 1, 2024
- Plan review
- ConstructionMay '24 – Dec '24
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRefrigeration system upgrades within existing building, no larger than 15,000 sq ft — shasta beverages, inc
TDLR project registrationAdditions to Existing BuildingProject Closed15,000 sq ft$1.6M est.- Project #
- TABS2024017458
- Tenant / owner
- Shasta Soda Factory Upgrade
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7333 Major Street
What is being built at 7333 Major Street in Houston?
A TDLR project registration describes refrigeration-system upgrades within Shasta Beverages’ existing building, rather than a new building. The record was filed May 1, 2024.
What is the project at 7333 Major Street for?
The registration describes upgrades to the refrigeration system at Shasta Beverages. It identifies the project as an addition to an existing building.
When was the Shasta Beverages refrigeration upgrade filed?
The TDLR registration was filed May 1, 2024. Its project number is TABS2024017458.
How much is the Shasta Beverages upgrade estimated to cost?
The applicant's estimated project cost in the TDLR record is $1,554,000. This is an estimate for the project, not a reported final cost.
How large is the Shasta Beverages upgrade?
The registration describes work in an area of no more than 15,000 square feet.
What project is near Zen Garage HQ on Telephone Road?
About 330 meters from Zen Garage HQ, the TDLR record for 7333 Major Street describes refrigeration-system upgrades at Shasta Beverages. The registration was filed May 1, 2024.
Also being built nearby
All of 77061- 7333 Major St · Shasta Beverages INCAug 7, 2025Beverage warehouse sink install · 76 m away
- 8701 Tewantin DrMay 14, 202133s residential repair spec list **repair only · 88 m away
- 211 Ipswich RdAug 22, 2019Residential detached garage conversion · 95 m away
- 205 Ipswich RdMay 31, 2023Sq ft residential solar panel addition · 156 m away
- 8714 Tweed DrMay 2, 2017Residential repairs per spec list · 179 m away
- 202 Ipswich RdAug 9, 2017Residential porch addition /remodel · 215 m away
- 211 Sandgate RdJul 15, 2019Residential repairs per spec list · 244 m away
- 8809 Tweed DrOct 15, 2019Residential repairs as per spec list · 263 m away
- 8816 Tweed DrMay 31, 2019Residential repair per spec list · 268 m away
- 8419 Tewantin Dr CnpyDec 1, 20231,536 sq ft new free-standing canopy · 288 m away
- 8700 Telephone Rd · Zen Garage HqMay 25, 2026Hobby area storage warehouse — new construction — new pre-engineered metal building storage warehouse and site improvements · 330 m away
- 8702 Telephone Rd Cnpy1Sep 27, 2017New 3,419 sq ft fuel dispensing canopy (2 of 3) · 331 m away