6220 South Dairy Ashford Rd
Houston, TX 77072 · Alief ISD
Elsik High School track and turf replacement
Alief ISD registered a track and football field turf replacement project at Elsik High School on April 12, 2024. The work includes track replacement, resurfacing of the long jump and pole vault areas, and new synthetic turf with a drainage system. The TDLR registration lists an estimated project cost of $2.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 12, 2024
- since Apr 12, 2024
- Largest scope
- 160,850 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
CompletedElsik High School Track & Turf Replacement
160,850 sq ft · $2.5M est.
- RegisteredApr 12, 2024
- Plan review
- ConstructionMay '24 – Jan '25
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectTrack replacement and resurfacing of the long jump, pole vault. long jump will be relocated into the new "d zone" on the new football field. field will be replaced with new syntenic turf with drainage system. — elsik high school
TDLR project registrationRenovation/AlterationProject Closed160,850 sq ft$2.5M est.- Project #
- TABS2024016080
- Tenant / owner
- Elsik High School Track & Turf Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6220 South Dairy Ashford Rd
What is being built at 6220 South Dairy Ashford Road?
A track and football field turf replacement project is registered for Elsik High School. The work includes new synthetic turf with a drainage system.
When was the Elsik High School project permitted?
The TDLR project registration was filed April 12, 2024. It is listed as Project TABS2024016080.
Is a new track being built at Elsik High School?
The registration describes track replacement and resurfacing of the long jump and pole vault areas. It is a renovation and alteration project, not a new school.
What is changing on the Elsik High School football field?
The field is slated for replacement with synthetic turf and a drainage system. The long jump will be relocated to a new “D zone” on the football field.
How much will the Elsik High School track and turf project cost?
The TDLR registration lists an estimated project cost of $2.5 million. This is the applicant's estimate for the project.
What is being renovated near Alief ISD on South Dairy Ashford Road?
Elsik High School's track and football field turf are included in a renovation project registered April 12, 2024. The registration lists the project as closed.
Also being built nearby
All of 77072- 6210 S Dairy Ashford Rd B-5Feb 2, 20223,185 sq ft office/warehouse spec lease buildout · 27 m away
- 6210 S Dairy Ashford Rd B-7Mar 28, 20223,250 sq ft ofc/wrhs speculative buildout · 27 m away
- 6210 S Dairy Ashford Rd B 10Aug 4, 20211,820 sq ft warehouse buildout · 27 m away
- 6210 S Dairy Ashford Rd B-2Oct 10, 20222,620 sq ft office warehouse buildout · 27 m away
- 6210 S Dairy Ashford Rd B-1Nov 14, 20222,620 sq ft office warehouse buildout · 27 m away
- 6210 S Dairy Ashford Rd B 9Oct 6, 20211,820 sq ft warehouse buildout · 27 m away
- 6210 S Dairy Ashford Rd A 3Feb 21, 20221,820 sq ft office/warehouse buildout · 27 m away
- 6210 S Dairy Ashford RdApr 4, 20221,820 sq ft office warehouse buildout · 27 m away
- 6220 S Dairy Ashford RdAug 29, 2024School track turf replacement · 63 m away
- 6207 Westbranch DrApr 5, 2024New (32) residential solar panels · 131 m away
- 6211 Westbranch DrFeb 6, 2024Sq ft residential solar panel addition · 138 m away
- 12703 Alief Clodine RdSep 5, 20241,535 sq ft convt to restaurant · 144 m away